Z -- Hungry Horse Dam Left Abutment Rock Scaling and Landslide Protection StructureHungry Horse Project, Montana

Notice Date
2/26/2009
 
Notice Type
Presolicitation
 
Contracting Office
Bureau of Reclamation - PNRO 1150 N Curtis Rd, Ste 100 Boise ID 83706
 
ZIP Code
83706
 
Solicitation Number
09SP101723
 
Archive Date
2/26/2010
 
Point of Contact
Susie Kramer Contracting Officer 2083785156 skramer@pn.usbr.gov;<br />
 
Small Business Set-Aside
Total HUB-Zone
 
Description
The Bureau of Reclamation, Pacific Northwest Region, has a requirement for rockscaling and installing a protective structure to protect an existing building from future falling rocks at Hungry Horse Dam and Powerplant, Hungry Horse, Montana. The principle components of work to be performed for the rockscaling include: removing all loose material and rock from the entire left abutment groin area; scaling an approximately 22,000 square-foot area between the top of the dam (El. 3565.0') and the base of the control bay building (El. 3135.0'); removing all loose or detachable rock, soil, brush, and woody debris that create a dangerous situation to work, workers, or the public, and haul to a site specified in the contract. The principle components for the protective structure include: cleaning and preparing existing concrete surface of left abutment control bay building wall; injecting cracks on the left abutment control bay building wall with a polyurethane resin; furnishing and installing threaded anchor rods for attaching the protective structure to the existing left abutment control bay building wall; furnishing, installing, and painting structural steel members (i.e., wide flanges, tee beams, plates, bars), and rod ends, nuts, and washers for the protective structure; furnishing and installing a geocomposite sheet drain on the left abutment control bay building wall; and furnishing and installing pressure treated timbers for the protective structure. This requirement will be issued as a negotiated request for proposals, and specific evaluation factors for the project will be described in the solicitation. This requirement is set-aside for HUBZone small business concerns. The North American Industry Classification System (NAICS) Code is 238990 and the size standard is $14 million in gross annual receipts averaged over the previous three 1-year accounting periods. The estimated price range of the work is $100,000 to $250,000. An electronic copy of the solicitation, including drawings, will be available APPROXIMATELY March 16, 2009, at www.fedbizopps.gov. Prospective vendors must be registered in CCR prior to the awarding any contract - see www.ccr.gov.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=a01aedfb23852bdbd1d2aa7ee35104b2&tab=core&_cview=1)
 
Place of Performance
Address: Hungry Horse Dam and Powerplant, approximately 20 miles northeast of Kalispell, Montana, and 9 miles southeast of Columbia Falls, Montana, in Flathead County.<br />
Zip Code: 59919<br />
 
Record
SN01758182-W 20090228/090226221233-a01aedfb23852bdbd1d2aa7ee35104b2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.