Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 05, 2009 FBO #2656
SOLICITATION NOTICE

Y -- CA PFH 123-1(1), Washington Road

Notice Date
3/3/2009
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
CA-PFH-123-1(1)
 
Archive Date
3/18/2009
 
Point of Contact
Brenda J McGehee,, Phone: 720-963-3353, Lori T. Kliethermes, Phone: 7209633355
 
E-Mail Address
brenda.mcgehee@fhwa.dot.gov, lori.kliethermes@fhwa.dot.gov
 
Small Business Set-Aside
8a Competitive
 
Description
BASED ON RESPONSES RECEIVED TO THE SOURCES SOUGHT NOTICE, THE DETERMINATION HAS BEEN MADE TO ADVERTISE THIS PROJECT AS AN 8(A) COMPETITIVE SMALL BUSINESS SET ASIDE. LOOK FOR SOLICITATION NUMBER DTFH68-09-B-00014. PROJECT DETAILS: This project is located within Tahoe National Forest on Forest Highway Route 123, Washington Road. The route begins at the junction with SR-20 about fifteen miles east of Nevada City, California, and proceeds 6.1 miles northerly through the community of Washington ending just across the South Yuba River Bridge at Maybert Road. The work consists of asphalt pavement and construction of a box culvert. The estimated price range for this solicitation is between $5,000,000 and $7,000,000. The solicitation will contain one schedule. Principal work items include: 242.00 stations of centerline verification and staking; survey and staking of 70 drainage structures; lump sum contractor testing; 4,000 ln ft of sediment log for soil erosion control; lump sum watering for dust control; removal of 54 individual trees; removal of 64 headwalls; 16,000 cu yd of roadway excavation; 20,000 tons of select borrow; 565 cu yds of placed riprap, various class; 3,800 tons of roadway aggregate, method 2; 11,500 tons of superpave pavement; 700 tons of superpave pavement, wedge and leveling course; 600 tons of minor hot asphalt concrete; 255 stations of continuous cold recycled asphalt base course; 121 tons of emulsified binder agent; 30 cu yd of concrete; 1,520 ln ft of pipe culvert (various length); 57 ln ft of 12-foot span, 8-foot rise precast reinforced concrete box culvert; 60 CALTRANS inlets; 1,000 ln ft of standard underdrain system; 1,600 sq yd of asphalt paved ditches; 2 temporary traffic control signal systems; 4,000 hours of temporary traffic control – flagger and pilot car; along with associated clearing and grubbing, concrete headwalls, and guardrail Advertisement of this project is based upon receipt of funding from the Economic Recovery Package. Tentative advertisement date is late March 2009.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=beab1b990fb35077f47d887b465c3d66&tab=core&_cview=1)
 
Place of Performance
Address: Tahoe National Forest, 631 Coyote Street, Nevada City, California, 95959, United States
Zip Code: 95959
 
Record
SN01760802-W 20090305/090303220801-beab1b990fb35077f47d887b465c3d66 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.