Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 11, 2009 FBO #2662
SOLICITATION NOTICE

28 -- ENGINE OVERHAUL

Notice Date
3/9/2009
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336412 — Aircraft Engine and Engine Parts Manufacturing
 
Contracting Office
NASA/Dryden Flight Research Center, Code A, P.O. Box 273, Edwards, CA 93523-0273
 
ZIP Code
93523-0273
 
Solicitation Number
EngineOverhaul
 
Response Due
3/19/2009
 
Archive Date
3/9/2010
 
Point of Contact
Terra L Calahan, Acquisistion Support, Phone 661-276-5985, Fax 661-276-2243, - Christina M Day, Acquisition Support Specialist, Phone 661-276-7065, Fax 661-276-2243, />
 
E-Mail Address
Terra.L.Calahan@nasa.gov, christina.m.day@nasa.gov<br
 
Small Business Set-Aside
Total Small Business
 
Description
NASA/DFRC has a requirement for an overhaul of Engine S/N 11216 from the GulfstreamIII Aircraft.1. ENGINE S/N 11216 INSPECTION WORKSCOPE A. Basic Labor Engine basic labor is defined in this work scope as the labor required to perform thefollowing tasks on the engine and accessories. Basic Labor does include calendarrequirements per Sp72-666 Revision 23. Disassembly Cleaning Detailed parts inspection Assembly Prep for test Final inspection Prepping for shipment This labor estimate is based on the assumption the engine was removed in normal run outcondition and has been operated per the Rolls-Royce guidelines. It does not take intoaccount for damaged engines or engine suffering excessive corrosion. The following accessory items will be inspected and tested as required:Fuel Flow RegulatorEjector Pump H.P. Fuel PumpL.P. Tach Generator L.P. Fuel Warning SwitchH.P. Tach Generator L.P. Fuel PumpAir Flow Control Actuator Ram RPM Signal (ACA) TransmitterH.P. Air Non Return Valves H.P. Shut Off CockAnti-Icing Pressure Transmitter L.P. Shaft GovernorAnti-Icing Air Control Valves Oil Pressure TransmitterTurbine Top Temperature Control Oil Pressure Warning SwitchActuator Thermocouples & Harness Generator Cooling Air Control Fuel NozzlesValve Fuel Heater Valve and ActuatorFuel Heater Oil CoolerLD Harness Fuel Pressure Diff SwitchOil Temp Transmitter Fuel Temp TransmitterFuel Pressure Transmitter Fuel TubesAir Outlet Overhead Warning Switch B. Consumable Kits Consumable kits are defined in the work scope as parts required to assemble the engine &its related accessories. This does not include normal wear and tear items. The typicalmakeup is of non-reusable gaskets, bolts, seals, washers, nuts and one-time use hardware.C. Test Cell Facility Use This fee covers the use of the test cell in addition to the labor to install and removethe Spey for test purposes. D. Fuel & Oil An average cost based on the standard fuel consumption of the engine and the duration ofthe test run required by Rolls-Royce Technical Publications. E. Recommended Modifications / Service Bulletins This item is for the Service Bulletins & Modifications that may be required to beincorporated on this engine. F. Estimated Material Attrition The amount of scrapped material and parts requiring repair which can and will occur inyour engines is dependent on several factors. These factors include hour to cycle ratio,reported and unreported engine operating problems, full thrust reverse, maximum TGT climbpower used, and environmental conditions during operations. *Items 1B through 1F should be totaled into one not-to-exceed price.*2. Engine Removal & Reinstallation Price is for the removal & reinstallation of the customers engine.This notice is a combined synopsis/solicitation for commercial items prepared inaccordance with the format in FAR Subpart 12.6, as supplemented with additionalinformation included in this notice. This announcement constitutes the onlysolicitation, which is issued as a Request for Quotation (RFQ); quotes are beingrequested and a written solicitation will not be issued. Offerors are required to usethe On-Line RFQ system to submit their quote. The On-line RFQ system is linked above orit may be accessed at http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=C&pin=. Theinformation required by FAR Subpart 12.6 is included in the on-line RFQ.The Government intends to acquire a commercial item using FAR Part 12 and the SimplifiedAcquisition Procedures set forth in FAR Part 13.Questions regarding this acquisition must be submitted in writing (e-mail is preferred)no later than March 14, 2009.It is the quoter's responsibility to monitor this site forthe release of amendments (if any). Potential quoters will be responsible fordownloading their own copy of this notice, the on-line RFQ and amendments (if any).An ombudsman has been appointed - See NASA Specific Note "B".Any referenced notes may be viewed at the following URLs link below.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=19cf25cd2eee0ab28ab96ceeddaa3015&tab=core&_cview=1)
 
Record
SN01765159-W 20090311/090310133118-e610f2246e35768424f963eb05f18675 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.