SOLICITATION NOTICE

Y -- Pool 8 Islands Phase 3 Stage 3A, Habitat Rehabilitation and Enhancement Project (HREP)

Notice Date
3/9/2009
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, St. Paul, US Army Engineer District, St. Paul, Contracting Division CEMVP-CT, 190 East Fifth Street, St. Paul, MN 55101-1638
 
ZIP Code
55101-1638
 
Solicitation Number
W912ES-08-B-0004
 
Response Due
3/23/2009
 
Archive Date
5/22/2009
 
Point of Contact
Patricia M. Simon, Phone: 6512905418
 
E-Mail Address
patricia.m.simon@usace.army.mil
 
Small Business Set-Aside
N/A
 
Description
The Corps received the following Question: Note 1. Drawings C-109, C-110, C-111 allows the USACE to change the size of the borrow areas. How is the contractor to estimate the amount of material available from each area if you can change the size of the area? It is possible that the contractor could estimate using the main channel area, Deadman's Slough, and head of raft channel only to find out that only 50% of the required volume is now available and the rest must come from the above Brownsville site. The cost for dredging each of these areas is vastly different. Response: There is enough information in the plans (bathymetry, cut dimension, typical section) for the contractor to calculate quantities available. Based on current information - we have estimated that there is enough material in the main channel cut to build all the islands in the contract. Depending on the approach, the contractors may or may not want to use the other cuts. We have not provided estimates for each cut, as conditions can change at any time. We do not know if the selected contractor will want to dredge from the Above Brownsville site, but we left that in as an acceptable source of material. The areas are identified as suitable areas for granular material and amounts available are based on the best information currently available regarding bathymetry. The notes on the plans identify those areas that may be dredged prior to construction and for which estimated quantities may change.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=fba45e285fcab0e97954e4cc80866220&tab=core&_cview=1)
 
Record
SN01765238-W 20090311/090310133301-fba45e285fcab0e97954e4cc80866220 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.