SOURCES SOUGHT
58 -- Joint Threat Emitter Increment 2 - Sources Sought
- Notice Date
- 4/17/2009
- Notice Type
- Sources Sought
- NAICS
- 334511
— Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, 84th Combat Sustainment Wing, 84 CBSG/PKR, 6039 Wardleigh Road, Bldg 1206, Hill AFB, Utah, 84056-5835
- ZIP Code
- 84056-5835
- Solicitation Number
- FA8217-09-R-JTE2-0002
- Point of Contact
- Michael Scott Arbon,, Phone: 8015862246
- E-Mail Address
-
michael.arbon@hill.af.mil
- Small Business Set-Aside
- N/A
- Description
- System Performance Specification Agenda Statement of Objectives Section M CDRL's NOTE: This is not a new requirement. This Sources Sought (SS)in conjunction with previous SS: FA8217-09-R-JTE2-0001, FA8217-09-R-JTE2, FA8217-08-R-JTE2, FA8217-08-R-XXX2, FA8217-08-R-TBD2, FA8217-08-R-TBD2, Overview : The purpose of this Sources Sought is to provide details concerning Hill Air Force Base's (HAFB) upcoming Pre-Acquisition Industry Day Session for the JI2 program. During this Industry Day Session, the government will provide an overview of the program's acquisition strategy, technical requirements, and contractual arrangements. Once the government has finished briefing, there will be a break for lunch. After which, there will be an opportunity for interested firms to meet one-on-one with the government team for no longer than one (1) hour. During this Individual Contractor Session, it is highly encouraged and expected that contractor's bring forth all of their concerns and questions relating to the attached DRAFT documents, including: Statement of Objectives, Section M, System Performance Specifications, and Contract Data Requirements Lists (CDRL's). Any firm interested in participating in an Individual Contractor Session, will need to notify the primary point of contact (POC), to ensure time is provided, no later than NTL 20 April 2009. Please realize and respect the time restraints for each individual meeting. Furthermore, these meetings are intended only for those firms interested and capable of providing the technological development of JI2 and should not be marketing oriented. If your firm believes it will not utilize a full hour of discussion time, please note in your correspondence for planning purposes. As stated in the earlier Sources Sought Synopsis, FA8217-09-R-JTE2-0001, each firm will be limited to a maximum of three (3) personnel. Please provide first and last names as well as titles. The Pre-Acquisition Industry Day Session for the JI2 program will be held at Hill Aerospace Museum (directions below). Parking is located directly west of the museum. Contractors should check-in at the front desk located through the center doors of the building and be seated NLT 9:30 AM MST. Dress Code: Business Casual DIRECTIONS From SLC Airport 1: Start out going SOUTHEAST on ramp. 2.7 mi 2: Merge onto I-80 E via the exit on the LEFT toward OGDEN/ PROVO. 0.9 mi 3: Merge onto I-215 N via EXIT 117 toward OGDEN. 6.8 mi 4: Merge onto I-15 N. 25.2 mi 5: Take the UT-97 exit, EXIT 338, toward 5600 SOUTH. 0.3 mi 6: Turn RIGHT onto W 5600 S. 0.0 mi 7: Turn SLIGHT RIGHT onto WARDLEIGH RD. 0.2 mi 8: Turn LEFT onto NORTH DR. 0.0 mi 9: Turn RIGHT. 0.3 mi 10: Turn LEFT onto WARDLEIGH RD. 1.2 mi 11: End at 7961 Wardleigh Rd Hill Afb, UT 84056-5842 **DO NOT ENTER HAFB GATE Estimated Time: 45 minutes Estimated Distance: 37.60 mile
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=dab1e8779ac42e7641f47dc6f0abc0b1&tab=core&_cview=1)
- Record
- SN01795842-W 20090419/090417215957-dab1e8779ac42e7641f47dc6f0abc0b1 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |