SOURCES SOUGHT
99 -- DTFANM-09-R-00069 - Fuel Monitoring System Replacement - Oakland ARTCC, Fremont, CA
- Notice Date
- 4/17/2009
- Notice Type
- Sources Sought
- Contracting Office
- Department of Transportation, Federal Aviation Administration (FAA), Northwest-Mountain Region, FEDERAL AVIATION ADMINISTRATION, ANM-52 ANM - Northwest Mountain
- ZIP Code
- 00000
- Solicitation Number
- DTFANM-09-R-00069
- Response Due
- 5/31/2009
- Archive Date
- 6/15/2009
- Point of Contact
- Gary Yount, (425) 227-1177<br />
- Small Business Set-Aside
- N/A
- Description
- The purpose of this web posting is to solicit offers for the subject project. Full project details are available for download from this website, including the Request for Offers (RFO)--which contains contract clauses and requirements for submitting an offer--and the Technical Specification. - Davis Bacon Act wage rates apply. - Estimated value: Between $25,000 and $40,000. - The NAICS Code for this project will be 221112. - There is a optional site visit on May 12, 2009 at 9:00 AM PDT. - OFFERS ARE DUE NO LATER THAN 4:00 PM local time on May 21, 2009. ATTACHMENTS (DOWNLOAD):1. RFO - DTFANM-09-R-00069 Fuel Monitoring System ZOA ARTCC.pdf2. Technical Specification - DTFANM-09-R-00069 Fuel Monitoring System ZOA ARTCC.pdf This project covers the requirements for all work associated with the Fuel Storage Tank Monitoring System replacement project at the Oakland Center Air Route Traffic Control Center in Fremont, CA. The Contractor shall furnish all labor, materials, and equipment in strict accordance with the referenced project specifications, drawings, and applicable FAA standards. All materials and equipment not indicated in the specification as GFM, shall be supplied by the Contractor. SCOPE OF WORK SUMMARY: Fuel Storage Tank Monitoring System. Perform the following scope of work, in strict adherence with the specifications, drawings, and FAA standards: 1.Design, furnish, and install a Veeder-Root TLS-350 fuel storage tank monitoring system. All equipment and system components furnished and installed shall be new and listed by ULI for their intended use.2.Provide oversight to FAA personnel during installation of conduit and wire associated with the new fuel storage tank monitoring system. Note that conduit and wire associated with the new fuel storage tank monitoring system will be installed by FAA personnel. 3.Provide system training and documentation.4.Warranty all new, non-GFM equipment and systems for a period of one year after final acceptance of the system by the FAA. Provide emergency repair service for the Fire Detection and Alarm System during the warranty period.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=a0ea1d427925574a44d1a800623ae7b7&tab=core&_cview=1)
- Record
- SN01796302-W 20090419/090417220919-72ad7043b10bc757c9188f3d5f12d278 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |