SOURCES SOUGHT
99 -- ST PAUL, MN RUNWAY 14 MALSR UPGRADES
- Notice Date
- 4/21/2009
- Notice Type
- Sources Sought
- Contracting Office
- Department of Transportation, Federal Aviation Administration (FAA), Great Lakes Region, FEDERAL AVIATION ADMINISTRATION, AGL-51 AGL - Great Lakes
- ZIP Code
- 00000
- Solicitation Number
- DTFAGL-09-R-00191
- Response Due
- 5/15/2009
- Archive Date
- 5/30/2009
- Point of Contact
- Yashoda Reddy, (847) 294-7297<br />
- Small Business Set-Aside
- N/A
- Description
- The Federal Aviation Administration (FAA) has a requirement for the Runway 14 MALSR Upgrades, at St Paul, Minnesota. The work under the subject project includes, but not limited to: Part "A" 1) Furnish labor and equipment to remove and dispose of existing aluminum light towers and cahnce anchor foundations. 2) Cabling into the existing Flasher Junction Boxes(FJBs) shall be disconnected. Cabling into the Individual Flasher Control Cabinets (ICCs) shall remain connected and coiled inside. All existing cabling shall be kept in operating condition, should replacement of cables described under Part "B" of theis contract not be accomplished. Dispose the existing FJBs. 3) New foundations shall be installed with new FJBs and reinstallingthe existing ICCs. New termination strips shall be installedinsode the new FJBs. 4) New Low Impact Resistance (LIR)towers Government Furnished Material (GFM)shall be assembled and installed. Nea lamp heads GFM shall also be installed. 5) All cabling shall be reconnected as installed so that previous operation of the flashers is achieved. 6) Furnish labor and materials to restore areas disturbed by construction activities to their original condition. 7) Reinstall Light Baffles on each Flasher LIR tower as indicated on drawings. 8) MALSR and Flasher System shall be tested and returned to its previous operational condition. Part "B" 1) Furnish and install 2-2" diameter Schedule 40 PVC plastic conduits between the new Flasher Station Junction Boxes from Station 16+00 through Station 24+00. Conduit shall be installed under the existing roadway (near Sta 17+00 and railing (near Sta 20+00)by "jacking" across,to meet the conduits on either side. 2) Furnish and install specified cabling between Stations,separating power and control cables into the separate conduits. New cables shall be installed into and out of the FJBs, the ICCs and the Flasher Lamp Heads. All cablibg shall be terminated as previously installed using new connectors. 3) Furnish labor and materials to restore areas disturbed by construction activities to their original condition. Restoration will include approximately 150' of blacktop across the Semple Brothers driveway between Stations 20+00 and 22+00. 4) Furnish and install cable markers along cable routes, two per flasher Station and one between Stations, at Stations 16+50, 20+50, and22+50. 5) MALSR and Flasher System shall be tested and returned to its previous operational condition. At least 50% of the total amount of work under the contract on site must be performed by the general contractor in strict accordance with the project documnets and contract provisions. Award of a firm-fixed price contract is being contemplated to a responsible offeror who submits the responsive offer for this requirement. To obtain a copy of the solicitation, interested firms may submit a wrotten request via FAX with your name, firm name, address and phone number to Dennis Shub, Netstar-1 (847)294-8051 or e-mail Dennis.CTR.Shub@faa.gov by close of business May 29,2009. VERBAL REQUESTS FOR THE RFO WILL NOT BE HONORED> PERFORMANCE PERIOD: 30 Calendar Days. NAICS Codes: 237990, and 238210 ESTIMATED PRICE RANGE: $100,000 to $150,000
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=51975de270d0598c4b57c2e75dfba73c&tab=core&_cview=1)
- Record
- SN01798009-W 20090423/090421220512-66cc7a08aabe534928172f277af19d63 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |