61 -- Molten Carbonate Fuel Cell Demonstration Project

Notice Date
4/22/2009
 
Notice Type
Presolicitation
 
NAICS
335999 — All Other Miscellaneous Electrical Equipment and Component Manufacturing
 
Contracting Office
Department of the Navy, Naval Air Systems Command, Naval Air Warfare Center Weapons Division Dept. 2, N68936 NAVAL AIR WARFARE CENTER WEAPONS DIVISION DEPT.2 Naval Air Warfare Center Weapons Division Dept.2 429 E. Bowen Rd - Stop 4015 China Lake, CA
 
ZIP Code
00000
 
Solicitation Number
N6893609R0059
 
Response Due
6/13/2009
 
Archive Date
6/13/2010
 
Point of Contact
Chris Thompson 760-939-2074 Theodore Fiske, 760-939-8182<br />
 
Small Business Set-Aside
Total Small Business
 
Description
The Naval Air Warfare Center Weapons Division, China Lake, CA intends to procure as a total small business set-aside one (1) 300 Kilowatt (KW) Molten Carbonate Fuel Cell (MCFC) Combined Heat & Power (CHP) System. This requirement requires the contractor to manufacture, install, commission, operate, and maintain a 300 KW MCFC CHP system at Submarine Base New London, Groton, Connecticut for testing purposes.The system will provide CHP to support base load requirements while also providing environmental and energy security benefits. Demonstration of reliability and interoperability with existing facility electrical and mechanical systems is a key objective. Operational data will be gathered, analyzed, and reported over a period of 36 months after fuel cell start-up to validate the performance and suitability of MCFC power systems at other Department of Defense facilities. The total period of performance of this contract is anticipated to be 48 months. Upon completion of the testing period, the system will be removed by the contractor and the site restored to its original condition, unless SUBBASE NEW LONDON desires to continue service. The resultant contract will include an option or multiple options to increase the installed capacity up to 1 megawatt (MW). Firm Fixed Price proposals are being requested. A complete Statement of Work will be provided with the Request for Proposal (RFP).
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=2dbd4a71c04c8af78363a63d7b1cdcff&tab=core&_cview=1)
 
Record
SN01798868-W 20090424/090422220557-2dbd4a71c04c8af78363a63d7b1cdcff (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.