58 -- Network Laptop System for MDB Airlocks, ECP-1690 - RFQ - Network Laptop System for MDB Airlocks, ECP-1690

Notice Date
4/27/2009
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
515111 — Radio Networks
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
 
ZIP Code
36201
 
Solicitation Number
ANCDF-RFQ-WA9-1863
 
Archive Date
5/21/2009
 
Point of Contact
John Danielson, Phone: 2562380721 x 183
 
E-Mail Address
john.danielson@wancdf.com
 
Small Business Set-Aside
N/A
 
Description
RFQ - Network Laptop System for MDB Airlocks, ECP-1690 Westinghouse Anniston (WA) is soliciting bids to install a network-laptop system with associated telephone jack in each of the four observation corridors outside airlocks (Airlocks 06-218, 220, 170 & 163) where the toxic entries are regularly implemented located in the Anniston Chemical Agent Disposal Facility (ANCDF). WA reserves the right not to award a subcontract after receipt of quotations. MAGNITUDE OF CONSTRUCTION The magnitude of construction for this solicitation is between $25,000 and $100,000 STATEMENT OF WORK Provide all labor, materials to Install a network-laptop system with associated telephone jack in each of the four observation corridors outside airlocks (Airlocks 06-218, 220, 170 & 163) where the toxic entries are regularly implemented in accordance with the Engineering work package & associated procurement. The scope of work includes, but is not limited to: Electrical: The following steps will be performed by a WA Subcontractor and WA IT, as noted: 1.1 Install a new single gang box in each of the two observation corridors outside the airlocks 06-218(Door 265) and 06-170 (Door 123). 1.2 Install ¾" conduit from black box located in MDB 2nd floor near the door 225 to the new single Gang Boxes located in the observation corridors outside airlocks 06-218(Door 265) and 06-170 (Door 123). 1.3 Intall 1-Cat 5e cable in ¾" conduit and existing penetrations from black box located in MDB 2nd floor near the door 225 to the single gang boxes located in the observation corridors outside the airlocks 06-218(Door 265) and 06-170 (Door 123). This will be a total of 2 Cat 5e cable pulls. Notes: Do not terminate the cables; IT group will terminate the Cat 5e cable on both ends. 1.4 Install a new fiber patch panel in observation corridor outside airlocks 06-220 (Door 255). 1.5 Install ¾" conduit from black box located in MDB 2nd floor near the door 225 to the existing IT1-514 cable tray. 1.6 Install ¾" conduit from the existing IT-531G cable tray to the patch panel located in the observation corridors outside airlock 06-220 (Door 255). 1.7 Intall 6 strand single mode fiber optic cable in ¾" conduit and cable tray from the black box located in MDB 2nd floor near the door 225 to the patch panel located in the observation corridor outside the airlock 06-220(Door 255). Note: Do not terminate the fiber optic cable; IT group will terminate fiber optic cable on both ends. 1.8 Install a new single gang box in observation corridor outside the airlocks 06-163(Door 111). 1.9 Install ¾" conduit from existing telephone board (M-178 A-1, B-1) located in control room to the existing IT-1078 cable tray. 1.10 Install ¾" conduit from the existing IT1-076A cable tray to the new single gang box located in the observation corridor outside airlock 06-163 (Door 111). 1.11 Intall a Cat 5e cable in ¾" conduit and cable tray from existing telephone board located in the MDB control room to new single gang box located in the observation corridor outside airlock 06-163 (Door 111). Note: Do not terminate the cable; IT group will terminate cable on both ends. 1.12 Install one (1) new 20A, 125V, NEMA 5-20R duplex receptacle near the black LAN box in MDB 2nd floor observation corridor. 1.13 Install one (1) new 20A, 125V, NEMA 5-20R duplex receptacle for Laptop Computer in observation corridor 09-216 outside airlock 06-218 (Door 265). 1.14 Install one (1) new 20A, 125V, NEMA 5-20R duplex receptacle for Laptop Computer in observation corridor 09-204 outside airlock 06-220 (Door 255). 1.15 Replace the existing 20A QOB-GFI circuit breaker on circuit number 27 in existing panel SPS-PANB-127 with a new 20A QOB bolt-on circuit breaker. 1.16 Apply Lockout/Tag-outs to circuits 21, 27 in the existing panel SPS-PANB-127 and circuit 7 in the existing panel SPS-PANB-125 to ensure that all energy sources are removed for equipment that is to be worked on in accordance with WA procedure SAF-2.25. 1.17 Install 3/4-inch conduit from the existing MDB SPS-PANB-127 Panel to the existing PT1-526D. 1.18 Install 3/4-inch conduit from the existing PT1-527 cable tray the new 20A, 125V duplex receptacle located near the black LAN box in MDB observation corridor. 1.19 Install 3/C #12 AWG Cu cable (1H, 1N, and 1G-Green) in the 3/4-inch conduit and existing cable tray from the circuit breaker on circuit 27 in the existing MDB SPS-PANB-127 Panel to the new 20A, 125V duplex receptacle located the near black LAN box in MDB observation corridor. 1.20 Install 3/4-inch conduit from the existing duplex receptacle located in the observation corridor 09-216 outside airlock 06-218 (Door 265) to the new 20A duplex receptacle located in the observation corridor 09-216 outside airlock 06-218 (Door 265). 1.21 Install 3-1/C #12 AWG Cu (1H, 1N, and 1G-Green) in the 3/4-inch conduit from the existing SPS-PANB-127-21 duplex receptacle located in the observation corridor 09-216 outside airlock 06-218 (Door 265) to the new 20A, 125V duplex receptacle. 1.22 Install 3/4-inch conduit from the existing duplex receptacle located under stair in the observation corridor to the new 20A duplex receptacle located in the observation corridor 09-204 outside airlock 06-220 (Door 255). 1.23 Install 3-1/C #12 AWG Cu (1H, 1N, and 1G-Green) in the 3/4-inch conduit from the existing SPS-PANB-125-7 duplex receptacle located under stair in the observation corridor to the new 20A duplex receptacle in the observation corridor 09-204 outside airlock 06-220 (Door 255). 1.24 All penetrations shall be sealed. A sealing material such as "Fire Foam" should be employed. 1.25 Label new duplex receptacles with the appropriate circuit no "SPS-PANB-127-27", "SPS-PANB-127-21" & "SPS-PANB-125-7". 1.26 Conductors shall be color coded or identified with phase tape as follows: Voltage Conductor Color 120/208V A Phase Black B Phase Red C Phase Blue Neutral White Ground Green 1.27 Install a NEMA 12 box for laptop computer in each of the four observation corridors outside airlocks (Airlocks 06-218, 220, 170 & 163) where the toxic entries are regularly implemented. 1.28 Install a NEMA 12 box for laptop computer in the PMB medical exam room #1. 1.29 After job has been completed, remove the LO/TO. General: 1. All testing and inspections to ensure that the final installation performs as designed. Period of Performance Work to commence by May 19, 2009 and complete by May22, 2009.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=a381b5134e21d39bfe51a470f04e7ddb&tab=core&_cview=1)
 
Record
SN01802676-W 20090429/090427215916-a381b5134e21d39bfe51a470f04e7ddb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.