AWARD
Z -- RECOVERY - Replace roof Bldg.501 @GAFB
- Notice Date
- 5/1/2009
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Air Force, Air Education and Training Command, Goodfellow AFB, Contracting Squadron, 210 Scherz Blvd, Bldg 707, Goodfellow AFB, Texas, 76908-4705
- ZIP Code
- 76908-4705
- Solicitation Number
- FA3030-08-R-0003
- Archive Date
- 5/9/2009
- Point of Contact
- Cameron L. Anderson,, Phone: 325-654-4766, William E Simpkins, Phone: (325) 654-1588
- E-Mail Address
-
cameron.anderson@goodfellow.af.mil, william.simpkins@goodfellow.af.mil
- Small Business Set-Aside
- N/A
- Award Number
- FA3030-08-D-0003-0042
- Award Date
- 4/24/2009
- Awardee
- All American Brothers Company, LLC., 4412 Serenity Lane, Bellaire, Texas 77401-3219, United States
- Award Amount
- $405.935.28
- Line Number
- 1001AB
- Description
- RECOVERY DEMOLITION: 1) The contractor shall remove the existing tar and gravel roof. 2) The contractor shall remove/reinstall all vents and hatches on the roof. 3) The contractor shall remove all decking and insulation down to concrete decking. 4) The contractor shall remove the satellite dish. NEW WORK: Architectural: 1) The contractor shall provide 1 ply felt to concrete deck as the roofing material is demolished to ensure building remains watertight. 2) The contractor shall provide new wood frame at a slope of ½" per foot 3) The contractor shall provide fireproofing to wood frame equal to Contego Intumescent Latex Film. 4) The contractor shall provide a shallow metal deck. Roof deck units shall be a 9/16" deep Type S3 unit fabricated of 22 gauge design thickness or thicker steel and shall be zinc-coated in conformance with ASTM A 525, G90 coating class. 5) The contractor shall provide 3" of polyisocyanurate (polyiso) insulation that meets R-21 requirement. 6) The contractor shall provide new 6 mil polyvinyl vapor barrier. 7) The contractor shall provide 1" of urethane roofing. 8) The contractor shall remove/reinstall dome. Plumbing: 1) The contractor shall raise vents, if needed. Electrical: 1) The contractor shall remove/replace lightning protection system & ensure that it is operational. 2) The contractor shall remove/replace all security lights as necessary and ensure they are operational.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=9f1ccba64c0d34c7ea230a33a9f07b81&tab=core&_cview=1)
- Record
- SN01807054-W 20090503/090501221607-9f1ccba64c0d34c7ea230a33a9f07b81 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |