Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 03, 2009 FBO #2715
AWARD

Z -- RECOVERY - Replace roof Bldg.501 @GAFB

Notice Date
5/1/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Goodfellow AFB, Contracting Squadron, 210 Scherz Blvd, Bldg 707, Goodfellow AFB, Texas, 76908-4705
 
ZIP Code
76908-4705
 
Solicitation Number
FA3030-08-R-0003
 
Archive Date
5/9/2009
 
Point of Contact
Cameron L. Anderson,, Phone: 325-654-4766, William E Simpkins, Phone: (325) 654-1588
 
E-Mail Address
cameron.anderson@goodfellow.af.mil, william.simpkins@goodfellow.af.mil
 
Small Business Set-Aside
N/A
 
Award Number
FA3030-08-D-0003-0042
 
Award Date
4/24/2009
 
Awardee
All American Brothers Company, LLC., 4412 Serenity Lane, Bellaire, Texas 77401-3219, United States
 
Award Amount
$405.935.28
 
Line Number
1001AB
 
Description
RECOVERY DEMOLITION: 1) The contractor shall remove the existing tar and gravel roof. 2) The contractor shall remove/reinstall all vents and hatches on the roof. 3) The contractor shall remove all decking and insulation down to concrete decking. 4) The contractor shall remove the satellite dish. NEW WORK: Architectural: 1) The contractor shall provide 1 ply felt to concrete deck as the roofing material is demolished to ensure building remains watertight. 2) The contractor shall provide new wood frame at a slope of ½" per foot 3) The contractor shall provide fireproofing to wood frame equal to Contego Intumescent Latex Film. 4) The contractor shall provide a shallow metal deck. Roof deck units shall be a 9/16" deep Type S3 unit fabricated of 22 gauge design thickness or thicker steel and shall be zinc-coated in conformance with ASTM A 525, G90 coating class. 5) The contractor shall provide 3" of polyisocyanurate (polyiso) insulation that meets R-21 requirement. 6) The contractor shall provide new 6 mil polyvinyl vapor barrier. 7) The contractor shall provide 1" of urethane roofing. 8) The contractor shall remove/reinstall dome. Plumbing: 1) The contractor shall raise vents, if needed. Electrical: 1) The contractor shall remove/replace lightning protection system & ensure that it is operational. 2) The contractor shall remove/replace all security lights as necessary and ensure they are operational.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=9f1ccba64c0d34c7ea230a33a9f07b81&tab=core&_cview=1)
 
Record
SN01807054-W 20090503/090501221607-9f1ccba64c0d34c7ea230a33a9f07b81 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.