Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 03, 2009 FBO #2715
AWARD

Z -- RECOVERY - Convert 72 rooms to 36 suites bldg. 3311 @GAFB

Notice Date
5/1/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Education and Training Command, Goodfellow AFB, Contracting Squadron, 210 Scherz Blvd, Bldg 707, Goodfellow AFB, Texas, 76908-4705
 
ZIP Code
76908-4705
 
Solicitation Number
FA3030-08-R-0003
 
Archive Date
5/7/2009
 
Point of Contact
Cameron L. Anderson,, Phone: 325-654-4766, William E Simpkins, Phone: (325) 654-1588
 
E-Mail Address
cameron.anderson@goodfellow.af.mil, william.simpkins@goodfellow.af.mil
 
Small Business Set-Aside
N/A
 
Award Number
FA3030-08-D-0003-0039
 
Award Date
4/22/2009
 
Awardee
All American Brothers Company, LLC., 4412 Serenity Lane, Bellaire, Texas 77401-3219, United States
 
Award Amount
423,765.72
 
Line Number
1001AB
 
Description
RECOVERY DEMOLITION: General requirements 1) Contractor shall demo existing tile as needed to remove tub and plumbing fixtures. 2) Contractor shall cut opening in wall between bedrooms for new pre-hung wood door And frame. (2'-8" x 6'-8") 3) Contractor shall demo existing vanity units, light fixtures, medicine cabinets, mirrors and associated plumbing on what is to become the new coffee bar area and the remaining bedroom area. 4) Contractor shall remove lockers(2) in bedroom area on what is to become the coffee bar area. 5) Contractor shall remove (2) 2'-0" x 6'-8" doors & frames between bedrooms & bathroom area. Architectural: 1) Contractor shall provide new wall vinyl as needed behind demoed locker area and removed door unit. (Vinyl provided by Gov.) 2) Contractor shall provide new vanity w/ solid surface ctop in remaining bedroom area. 3) Contractor shall fill in wall between new coffee bar and bathroom where door was removed. 4) Contractor shall tape, float, texture & paint all filled in openings, walls with new penetrations and all bathroom walls, doors (clear coat), and door frames. (Colors: TBD) 5) Contractor shall provide (1) new 2'-8" x 6'-8" pre-hung wood door with privacy hardware between living area and bedroom 6) Contractor shall provide (1) new 2'-0" x 6'-8" solid core wood door with hol. Mtl. Frame between bedroom and bathroom. 7) Contractor shall provide new ceramic tile and duro rock around tub. (As Needed) (Tile to match existing) 8) Contractor shall steam clean carpet once room is complete. Mechanical: 1) Contractor shall provide new plumbing fixtures, supply and waste water lines and angle stops to the bathroom sink. 2) Contractor shall provide new cast iron tub. 3) Contractor shall provide new isolation valves to tub. 4) Contractor shall provide new supply and waste lines to new mixing valve for tub. Electrical: 1) Contractor shall provide new quad outlet at bar area. 2) Contractor shall provide new light switch and light in coffee area.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=55841d0f32d0e95ca7279347056f00a3&tab=core&_cview=1)
 
Record
SN01807298-W 20090503/090501222150-55841d0f32d0e95ca7279347056f00a3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.