AWARD
Z -- RECOVERY - Install 12" Sewer line from dorms to street @ GAFB
- Notice Date
- 5/1/2009
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Air Force, Air Education and Training Command, Goodfellow AFB, Contracting Squadron, 210 Scherz Blvd, Bldg 707, Goodfellow AFB, Texas, 76908-4705
- ZIP Code
- 76908-4705
- Solicitation Number
- FA3030-08-R-0003
- Archive Date
- 5/7/2009
- Point of Contact
- Cameron L. Anderson,, Phone: 325-654-4766, William E Simpkins,, Phone: (325) 654-1588
- E-Mail Address
-
cameron.anderson@goodfellow.af.mil, william.simpkins@goodfellow.af.mil
- Small Business Set-Aside
- N/A
- Award Number
- FA3030-08-D-0003-0038
- Award Date
- 4/22/2009
- Awardee
- All American Brothers Company, LLC., 4412 Serenity Lane<br />, Bellaire, Texas 77401-3219, United States
- Award Amount
- 659,745.51
- Line Number
- 1001AB
- Description
- RECOVERY 1) Contractor shall remove topsoil where needed. 2) Contractor shall demolish concrete sidewalk where needed. 3) Contractor shall demolish concrete/asphalt paving and base course where needed. 3) Contractor shall remove landscaping rock to a site approved by the Contracting Officer for re-installation later in this project. NEW WORK: Architectural: 1) Contractor shall provide new hydro mulch (seeding) for excavated areas. 2) Contractor shall excavate for sewer line, connections and manhole installation. 3) Contractor shall compact trench and bedding per SABER Spec's. 4) Contractor shall provide new sections of sidewalk/curb and gutter where removed from excavation site. 5) Contractor shall provide new landscaping felt and re-install rock where needed. 6) Contractor shall provide new base course where needed. 7) Contractor shall provide new concrete/hot-mix/hot lay asphalt for street repair where needed. Plumbing: 1) Contractor shall provide new 12" PVC sewer line. 2) Contractor shall provide new concrete pre-cast sewer manholes (complete). 3) Contractor shall provide repair to irrigation systems where needed. 4) Contractor shall provide new sand bedding for sewer line. 5) Contractor shall provide new tie-in to existing sewer line. 6) Contractor shall provide boring under streets for new sewer line. 7) Contractor shall provide steel case for pipe borings. 8) Contractor shall provide capping of existing sewer main lines (see drawing). 9) Contractor shall provide new cutout for 12" line to be installed in existing manhole servicing buildings 3227 and 3139. 10) Contractor shall provide re-routing of existing sewer lines from existing manholes serving buildings 3220, 3340, 3525, 3519, 3510, 3453 and 3206 to new 12" sewer main manholes (see drawing). 11) Contractor shall provide new irrigation repairs to existing systems. Electrical: 1) Contractor shall provide electrical wiring repair to irrigation systems.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=d14b3111949e0e872211aa536cecadbb&tab=core&_cview=1)
- Record
- SN01807319-W 20090503/090501222220-d14b3111949e0e872211aa536cecadbb (fbodaily.com)