Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 07, 2009 FBO #2719
SOLICITATION NOTICE

H -- Request for Expression of Interest - Subsurface Grout Stabilization of Specific Waste Targets Located at the Idaho National Laboratory

Notice Date
5/5/2009
 
Notice Type
Modification/Amendment
 
NAICS
921190 — Other General Government Support
 
Contracting Office
Department of Energy, Idaho National Laboratory (ICP-Idaho Cleanup Contractor), ICP-Idaho Cleanup Contractor, 1955 Freemont Drive, Idaho Falls, Idaho, 83415
 
ZIP Code
83415
 
Solicitation Number
CWI003
 
Archive Date
6/6/2009
 
Point of Contact
Derek Flynn,, Phone: 208-533-0815
 
E-Mail Address
FLN@icp.doe.gov
 
Small Business Set-Aside
N/A
 
Description
REQUEST FOR EXPRESSION OF INTEREST - SUBSURFACE GROUT STABILIZATION OF SPECIFIC WASTE TARGETS LOCATED AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX AT THE RADIOACTIVE WASTE MANAGEMENT COMPLEX AT THE IDAHO NATIONAL LABORATORY CH2M-WG Idaho, LLC (CWI), is a FAR Based Contractor under contract with the Department of Energy (DOE) to perform cleanup at the Idaho National Laboratory (INL) Site located approximately 50 miles west of Idaho Falls, Idaho. CWI is requesting an expression of interest (EOI) from prospective Vendors or Consortiums to provide equipment and services to perform subsurface grouting of waste located at the INL. This expression of interest shall serve only as a method of establishing technical capabilities and commercial interest. Previous DOE experience is favorable. Evidence of a qualified work force, regularly engaged in the trades required to complete such work, is required. Qualified candidates may be invited to participate in follow-on technical or business discussions which may include on-site visit(s) from CWI technical staff to examine drilling/grouting hardware. The INL is located in southeastern Idaho and occupies 890 mi 2 on the northeastern region of the Snake River Plain. Within the boundary of the INL, the Radioactive Waste Management Complex (RWMC) was created in 1952 for the disposal of radioactive waste. Waste was disposed of in pits and trenches. Historically, waste containing radioactive and hazardous substances was managed in accordance with laws and disposal practices current at that time. Present day operations involve the remediation of these sites. The waste targets associated with this EOI are located in the RWMC's Subsurface Disposal Area (SDA). The treatment area comprises up to 20 discrete disposal locations (totaling approximately 0.2 acres) in SDA trenches and soil vault rows. Treatment will be performed via pressure grouting utilizing a preferred cement based grout formulation. The work scope includes furnishing all necessary facilities, equipment, labor, materials, operating documentation, supplies, and tools to perform all operations necessary to emplace the selected grout. Chemically, and/or radiologically contaminated soil and debris may be encountered during the remedial action activities. The subcontractor will be required to integrate their work with Contractor facility operations and oversight and monitoring organizations (e.g., Safety, Industrial Hygiene, or RadCon personnel monitoring and material sampling, etc.). Work will be performed in compliance with the applicable sections of 29 CFR 1910, 29 CFR 1926, and the CWI Subcontract Requirements Manual. Involvement with small business firms is recommended and all work must be performed under the requirements of the Davis Bacon Act. Additional information In general, the work scope includes, but is not limited to, the following project elements: •· Work planning to include as a minimum development of operational procedures and training, •· Pre-mobilization acceptance testing, •· Mobilization and site preparation, •· Performance Testing at the INL, •· Grout application in the SDA; to include grout placement and demonstration of acceptable completion of the ISG treatment, •· Site clean-up, hardware decontamination, and demobilization, •· Reporting and contract close-out Additional information regarding INL subcontractor requirements or specifics of this remedial action contained in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision, is available to the public by accessing the INL home page and the Administrative Record link. Telephone calls will not be accepted. Technical questions may be sent by email to fln@icp.doe.gov. Please provide your expression of interest to the undersigned Mr. Derek Flynn, CH2M-WG Idaho, LLC, Idaho Cleanup Project, P.O. Box 1625, Idaho Falls, ID 83415-4201. Submittals must be received no later than 4:00 p.m. Mountain Standard Time on May 22, 2009.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=3097fd458cb8ca397e0d23ad699b1199&tab=core&_cview=1)
 
Place of Performance
Address: Radioactive Waste Mangement Complex at the Idaho National Laboratory, Scoville, Idaho, United States
 
Record
SN01809699-W 20090507/090505222030-ea2e975121606f3fde7ffc88f2aaedc0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.