SOURCES SOUGHT
66 -- 2 EACH - GPC SYSTEMS
- Notice Date
- 5/14/2009
- Notice Type
- Sources Sought
- NAICS
- 811219
— Other Electronic and Precision Equipment Repair and Maintenance
- Contracting Office
- Department of Energy, Federal Locations, All DOE Federal Contracting Offices, NETL - PittsburghU.S. Department of EnergyNational Energy Technology Laboratory626 Cochrans Mill RoadPittsburghPA15236-0940
- ZIP Code
- 15236-0940
- Solicitation Number
- DE-SOL-0000483
- Response Due
- 5/29/2009
- Archive Date
- 6/28/2009
- Point of Contact
- Robert L. Mohn
- Small Business Set-Aside
- N/A
- Description
- WE NEED TWO GPC SYSTEMS ? ONE FOR ORGANICS (COMPLETE WITH DMF COUMNS CAPABLE OF RESOLVING MOLECULAR WEIGHT RANGES 200-3M) AND ONE FOR AQUEOUS (COMPLETE WITH WATER BASED COLUMNS CCAPABLE OF RESOLVING MOLECULAR WEIGHT RANGES 100-10M). STANDARDS FOR GPC CALIBRATION FOR BOTH SYSTEMS AND ONE PC UNIT MUST BE INCLUDED. EACH SYSTEM MUST BE COMPRISED OF AN ISOCRATIC PUMP, VACUUM DEGASSER, AN AUTOSAMPLER, AN OVEN/COLUMN COMPARTMENT, UV DETECTOR (COMPLETE WITH STANDARD FLOW CEEL), A REFRACTIVE INDEX DETECTOR, AN INTERFACE UNIT (TO CONNECT BOTH GPC SYSGTEMS TO ONE PC), A GUARD COLUMN, ALL THE PLUNGER AND PUMP SEALS, INSTALLATION AND FAMILIARIZATION. TWO OR MORE GPC COLUMNS FOR ORGANIC, WITH A MW RANGE FROM 200-3M. TWO OR MORE GPC COLUMNS FOR AQUEOUS, WITH A MW RANGE FROM 100-10M. TWO GUARD COLUMNS, ONE FOR ORGANIC AND ONE FOR AQUEOUS. IN THE GPC STANDARD KITS, THERE MUST BE AT LEAST MIXTURES OF FOUR STANDRDS, AND ALSO ONE BROAD MW STANDARD.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0000483/listing.html)
- Record
- SN01817482-W 20090516/090514220537-b78cbd1f07ab617a85d57c7ee5793bd9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |