Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 20, 2009 FBO #2732
AWARD

41 -- 9,000 18,000 and 36,000 British Thermal Unit/Hour (BTU/H) Improved Environmental Control Units (IECUs)

Notice Date
5/18/2009
 
Notice Type
Award Notice
 
NAICS
333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, US Army CECOM Contracting Center-Washington, US Army CECOM Contracting Center-Washington, ATTN: AMSEL-AC-W, 2461 Eisenhower Avenue, Alexandria, VA 22331-0700
 
ZIP Code
22331-0700
 
Solicitation Number
W909MY-08-R-0014
 
Archive Date
6/17/2009
 
Point of Contact
Patricia Davis, 703-325-1713<br />
 
E-Mail Address
US Army CECOM Contracting Center-Washington
(pat.davis@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W909MY-09-D-0001
 
Award Date
5/13/2009
 
Awardee
Hunter Manufacturing Company30525 Aurora RoadSolon, Ohio 44139
 
Award Amount
41588650
 
Line Number
0001-0003, 0004-5008
 
Description
Department of Defense (DoD) Project Manager- Mobile Electric Power (PM MEP) for four Improved ECU variants: 1) 9,000-Btu/hr, 115 volt, single phase, 50/60 Hertz; 2) 18,000-Btu/hr, 208 volt, 3 phase, 50/60 Hertz; 3) 18,000-Btu/hr, 230 volt, single phase, 50/60 Hertz; and, 4) 36,000-Btu/hr, 208 volt, 3 phase, 50/60 Hertz. The acquisition will be executed in four phases. First, a full and open competitive acquisition will be conducted, culminating in award of up to two Indefinite Delivery/ Indefinite Quantity (ID/IQ) contracts for performance of parallel IECU Phase I development efforts, with availability for ordering further development and production. During Phase I, the two selected contractors will separately perform twelve month Cost-Plus-Fixed-Fee (CPFF) Delivery Orders for the Phase I of System Development and Demonstration (SDD). Phase I will include design and fabrication of two prototypes of the 9,000-Btu/hr, 115 volt, single phase, 50/60, and two prototypes of the 18,000-Btu/hr, 208 volt, 3 phase, 50/60 Hertz, as well as limited testing to evaluate the contractors' performance. Following completion of Phase I, the Government intends to conduct a down-selectbetween the two Phase I contractors; and select one to perform a twenty-four month Phase II CPFF Delivery Order requiring completion of SDD efforts on all four IECU variants. During Phase II, the contractor will be required to design, fabricate, and test eight prototypes per variant to total thirty-two prototypes. Additionally, all four variants will be subjected to Product Qualification Test (PQT), Logistics Demonstration, and User Evaluation. Technical Data Packages (TDPs) and Electronic Technical Manuals (ETMs), along with other logistics documents, will be developed and validated for all four variants. Phase III will be a Delivery Order for an eight month Firm-Fixed-Price (FFP) Delivery Order for Low-Rate Initial Production (LRIP), requiring delivery of 60 of each IECU variant. Phase IV is Full Rate Production and will allow for issuance of FFP Delivery Orders for a maximum of approximately 9,460 IECU units. Phase III and IV also include the purchase of initial spare and repair parts, updates to logistics documentation, and user training. The small business size standard for NAICS 333415 is 750 employees. Small business subcontracting plans are required for all contractors who exceed this standard.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/USAMC/DAAB15/Awards/W909MY-09-D-0001.html)
 
Record
SN01821583-W 20090520/090518235511-501a2f3b9275382769381b0bd027cab5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.