Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 21, 2009 FBO #2733
SOLICITATION NOTICE

C -- Architect Engineer Services for Two Small Business Indefinite Delivery Indefinite Quantity Contracts Primarily for the Design of Army Reserve and Military Projects Within the Great Lakes and Ohio River Division Mission Boundaries

Notice Date
5/19/2009
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Louisville, US Army Corps of Engineers, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR-09-R-0059
 
Response Due
6/18/2009
 
Archive Date
8/17/2009
 
Point of Contact
Jennifer Anderson, 502-315-6176<br />
 
E-Mail Address
US Army Corps of Engineers, Louisville
(jennifer.j.anderson@lrl02.usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
The NAICS code for this procurement is 541330. This announcement is set aside for small business firms. The proposed services, which will be obtained by negotiated Firm Fixed Price Contracts, are primarily for Architect/Engineer services for Army Reserve projects, and may also be used for other military projects within the Great Lakes and Ohio River Division mission boundaries. The Louisville District Army Reserve mission is nationwide. Projects outside the primary mission area may be added at the Governments discretion upon agreement of the A/E firm. Projects will be awarded by individual task orders. The maximum cumulative contract value for each contract is $7,500,000. The contract period is five years. The estimated construction cost per project is approximately between $1,000,000 and $25,000,000. The top ranked firm will be awarded the first contract and the second ranked firm will be awarded the second contract. If necessary, secondary selection criteria will be used as a tiebreaker between firms considered as technically equal. The following factors will be used in deciding which contractor will be selected to negotiate task orders: performance and quality of deliverables under the current contract, capacity to accomplish the work in the required time, uniquely specialized experience, and equitable distribution of work among the contractors. Significant emphasis will be placed on the A/Es quality control procedures, as the District will perform the Quality Assurance role only. Estimated start date is July 2009. To be eligible for award, a firm must have a DUNS number and be registered in the DoD Central Contractor Registration (CCR) database, via the CCR Internet site at http://ccr.gov or by contacting the DoD Electronic Commerce Information Center at (800) 334-3414. Register to provide representations and certifications at http://orca.bpn.gov. The Louisville District and the U.S. Army Reserve plan to partner this Program. The selected firms will be required to attend annual two-day partnering workshops to define the Governments expectations of the A/E, create a positive working atmosphere, encourage open communication, and identify common goals. Cost for these sessions will be borne by the selected A/E. 2. PROJECT SPECIFIC INFORMATION: Projects may consist of A/E services for horizontal and vertical military and U.S. Army Reserve projects. This contract is primarily intended to carry out the design requirements of the U.S. Army Reserve (USAR) Full Facility Revitalization Construction Program. A/E services may consist of complete designs; concept level designs; development of design/build requests for proposal; site investigation of existing conditions; engineering services during construction; design of demolition/deconstruction; hazardous materials survey, analysis, and abatement methodology; sustainable design; construction cost estimates and schedules; technical studies/analysis in support of design for new construction and renovation projects at various locations; and comprehensive planning that is related to future construction requirements on military installations. The required project task orders under this IDIQ contract may include some or all of the following types of building structures: Training Centers (which include administration, education, assembly, storage, special training and other support spaces); Vehicle Maintenance Shops (which include work bays, administration, special training, storage & support spaces); Stand-Alone Buildings (which include unheated storage & Direct Support/General Support warehouses); and other Army Reserve and military facilities. Associated design effort may include: civil site design; demolition and/or renovation of existing facilities; environmental compliance; NEPA documentation associated with a design project; controlled waste and flammable storage; asbestos, lead and PCB surveys and/or abatement & utility investigations. Other functions beyond traditional design may include: the development of simplified design approaches, using Army Reserve Design Criteria to carry out designs for the USAR Full Facility Restoration Program; updating the Army Reserve Design Criteria (this may be a part of project specific requirement or as requested by the Army Reserve to create or update the specific specifications, and/or graphic data); performance of engineering feasibility studies, site assessments, and DD Form 1391 development related to new USAR projects and project sites; providing construction phase services (shop drawing review, site inspection, etc. for Army Reserve construction projects). Construction cost estimating will be accomplished using the Micro-Computer Aided Cost Estimating System 2nd Generation (MII) software (software and database is available from the Government for a nominal fee). Specifications must be electronically developed using Unified Facilities Guide Specifications (UFGS), Louisville District Guide Specifications, modified Corps of Engineers Guide Specifications created for the Army Reserve, and Industry Standard Specifications. All specifications shall be developed/edited using SpecsIntact Automated Specification processing system. Specifications shall be provided to the government in the native SpecsIntact format, MicroSoft Word format and Adobe.PDF format (see the individual submittal requirements for which are to be submitted). CADD products will be accomplished using either MicroStation version XM or newer OR AutoCAD version 2008 or newer. At the beginning of each project, the required version and individual packages to be used shall be reviewed and, when approved, versions and usage adjusted. For specific projects, the awarded firm may be required to provide resumes or completed SF330 forms for a certified industrial hygienist, and/or a laboratory accredited in Bulk Asbestos Fiber Analysis given by the National Institute of Standards and Technology (NIST) under the National Voluntary Laboratory Accreditation Program (NVLAP), as part of the design team. The hygienist must be a Certified Industrial Hygienist (CIH) as certified by the American Board of Industrial Hygienist (ABIH). A laboratory accredited in Bulk Asbestos Fiber Analysis given by the National Institute of Standards and Technology (NIST) under the National Voluntary Laboratory Accreditation Program (NVLAP) must be available for hazardous material testing as needed. The selected firm will be solely responsible for the designs that they produce, and will become the Designer of Record for each individual project within their contract. Firms should have experience in using the CADD software and with using and writing project specifications in the SpecsIntact processing system. All products must conform to the latest release of Tri-Service A/E/C CADD Standards. 3. SELECTION CRITERIA: The specific selection criteria (a through d are primary and e is secondary) in descending order of importance are as follows and must be documented with resumes in the SF 330: a) Professional Qualifications: Resumes for two project managers (design team leaders) for task orders, both registered as an engineer or architect. Also required are resumes for two designers and one checker in the following fields: architecture; civil; structural (independent of civil); mechanical; and electrical engineering are necessary with at least two in each field professionally registered in the relevant professional field as an engineer or architect. A resume for one designer and one checker in the following fields: environmental engineering, geotechnical (soil engineering); and fire protection engineering is necessary with at least one in each field professionally registered in the relevant professional field as an engineer. The fire protection engineer shall be a registered professional engineer with a minimum of five years dedicated to fire protection engineering, AND meet one of the following conditions: (a) A degree in Fire Protection Engineering from an accredited university; (b) passed the National Council of Examiners for Engineering and Surveys (NCEES) fire protection engineering examination; OR (c) registration in an engineering discipline related to fire protection engineering. Two resumes for Interior Designers are required, both must be certified by the National Council of Interior Design Qualifications (NCIDQ), be registered Interior Designers, or registered architects with at least five years of experience and training in interior design. Additionally, at least one professional, qualified by a combination of education, registration, certification, and/or training is required in each of the following fields: registered communication distribution designer (RCDD); cost estimating, landscape architecture, life safety, and hazardous material inspection and abatement methods. The hazardous materials inspector must have successfully completed an EPA approved asbestos inspectors course and be able to obtain an asbestos inspectors accreditation in the state where the survey is being conducted. The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. The individuals identified by project roles may not be identified for more than one role. b) Specialized Experience and technical competence in the expected activities identified above, to include experience with: design/build project design methodology; projects utilizing Sustainable Design (using an integrated design approach and emphasizing environmental stewardship, with experience in energy and water conservation and efficiency; use of recovered and recycled materials; waste reduction, reduction or elimination of toxic and harmful substances in facilities construction and operation; efficiency in resource and materials utilization, development of health, safe and productive work environments; and employing the LEED evaluation and certification method); anti-terrorism and force protection measures; construction cost estimating using M-CACES 2nd Generation; electronic drawing development utilizing a CADD system and design charrettes as evidenced by the resumes of the key personnel assigned to this project. Only resumes identifying the professionalism and specialized experience of key members of the design team are necessary. Other available personnel may be specified in paragraph H of the SF330. In addition, the following must be addressed in paragraph H of the SF330; a brief Design Quality Management Plan including an explanation of the firms management approach; management of subcontractors (if applicable); quality control procedures (for plans, specifications, design analysis and electronic documents); procedures to insure that internal resources are not over-committed; and an organizational chart showing the inter-relationship of management and various team components (including subcontractors). In Block H also indicate the estimated percentages involvement of each firm on the proposed team or describe the type of work and roles the prime and subcontractors will perform. c) Capacity to complete the work in the required time with the understanding that this contract will require multiple design teams to work individual task orders at various locations simultaneously; d) Past performance on DoD and other contracts to include cost control, quality of the work, and compliance with performance schedules; e) Extent of participation of Small Business, Small Disadvantaged Business, historically black colleges and universities, and minority institutions in the proposed contract team, measured as a percentage of the estimated effort. 4. SUBMISSION REQUIRMENTS: Interested firms having the capabilities to perform this work must submit one paper copy and one electronic copy on CD of the SF 330, Part I, and one paper copy of the SF 330, Part II for the prime firm. Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Responding firms must submit a current and accurate SF 330, Part II, for each proposed consultant. The proposal shall be submitted as one file using Microsoft Word (.doc) or Adobe Acrobat (.pdf). Font size shall be 10 or larger. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting 1-866-705-5711, or via the internet at www.dnb.com. Questions about the Dun &Bradstreet number should be directed to Marilyn Kells (ACASS/CCASS/CPARS Program Analysis Officer) at 503-808-4590. The SF 330 will be no longer than 100 pages in length (excluding the SF 330, Part IIs) and block H will be 20 pages or less in length. Each printed side of a page will count as one page. Release of firm status will occur within 10 days after approval of any selection. All responses on SF330 to this announcement must be received no later than 4:00 p.m. local time on 18 June 2009. No other information including pamphlets or booklets is requested or required: No other general notification to firms under consideration for these contracts will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. Submit responses to US Army Corps of Engineers, ATTN: Contracting Point of Contact: Jennifer Anderson at 502 315-6176, Email: Jennifer.j.anderson@usace.army.mil, 600 Dr. Martin Luther King, Jr., Pl., Room 821, Louisville, KY 40202.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-09-R-0059/listing.html)
 
Place of Performance
Address: US Army Corps of Engineers, Louisville 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville KY<br />
Zip Code: 40202-2230<br />
 
Record
SN01822383-W 20090521/090520001525-fe8029a62299e58f4f233db4ef847977 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.