MODIFICATION
P -- Demolition
- Notice Date
- 5/20/2009
- Notice Type
- Modification/Amendment
- NAICS
- 238910
— Site Preparation Contractors
- Contracting Office
- Department of the Army, Army Contracting Agency, South Region, ACA, Fort Campbell, ACA, Fort Campbell, Directorate of Contracting, Building 2174, 13 ? & Indiana Streets, Fort Campbell, KY 42223-1100
- ZIP Code
- 42223-1100
- Solicitation Number
- W9124809BA001
- Response Due
- 5/22/2009
- Archive Date
- 7/21/2009
- Point of Contact
- SaLonda M. Ozier, 270-798-7810<br />
- E-Mail Address
-
ACA, Fort Campbell
(salonda.m.ozier@us.army.mil)
- Small Business Set-Aside
- Total HUB-Zone
- Description
- Description: Questions received from interested participants and our responses follow: 1. QUESTION: There are line items for 1-story and 2-story wooden buildings. What line items will be used for a masonry or concrete structure? RESPONSE: Line Items 0008 and 0009 will be used for masonry or concrete structures. (Note: Bid schedule is revised and attached.) 2. QUESTION: What is the interpretation of a stem wall for this contract? RESPONSE: Stem walls are concrete or cinder block walls used for the World War II buildings and on some other buildings. If walls are not concrete block or cinder block, line items 0008 and 0009 will be used. 3. QUESTION: The offer schedule lists 15,000 LF of concrete stem wall. What are the dimensions of this wall? RESPONSE: The stem walls will have various dimensions. The stem walls will be calculated in square/feet of surface area 8 to 14 think. 4. QUESTION: Is there a charge per ton for dumping at the base landfill? RESPONSE: No. 5. COMMENT: I noticed that Line Item No. 0004 Disconnect sewer or gas lines is in the base year and the 1st option year but it is left out of the 2nd, 3rd, and 4th option years and it changes the item umbers of the lines in those years. RESPONSE: Line Item No. 0004 should be included in all option years. The bid schedule has been revised. 6. QUESTION: When borrow permits are issued for fill dirt, does the contractor provide the equipment for digging? RESPONSE: Yes. 7. QUESTION: Do soil tests have to be done on borrow dirt? RESPONSE: No. 8. QUESTION: How many buildings are there in each year? RESPONSE: We estimate 10 to 12 per year. 9. QUESTION: What is the demo schedule? For example: Can we do a couple of buildings at a time or is it going to be just one at a time? RESPONSE: Quantities on delivery orders will vary; a quantity of one at a time may be ordered. 10. QUESTION: Do any of the buildings to be demo have identified asbestos containing material? RESPONSE: Yes but asbestos will be removed prior to demo by the abatement contractor except for what is identified on the roofs. This is due to safety issues. The abatement contractor and the demo contractor shall coordinate the removal when it is on the ground. 11. QUESTION: In the contract it says that a minimum of 50% has to be recycled. Does that include concrete? Do windows and doors have to be recycled prior to start of demolition? RESPONSE: Concrete is included. If the contractor can meet his 50% recycled requirement without the windows and doors, then recycling of windows and doors prior to start of demolition shall not be required. 12. QUESTION: Will all the haul tickets from the landfill and recycle centers be used to calculate the recycled amounts or will the actual numbers in the contract be used? RESPONSE: The landfill tickets and all weight tickets showing diversion will be used to calculate the recycled amounts. 13. QUESTION: Are there any costs associated with permits needed for this job? RESPONSE: No. 14. QUESTION: Does the contract require a Bid Bond or Performance Bond? RESPONSE: NO 15. QUESTION: /The price for a gallon of diesel today is $2.40. The price for a gallon of diesel one year ago was $4.69. There is no way for us to know how much fuel prices will rise. If today's price of diesel doubles or triples in the next 5 years while this contract is ongoing will we be able to charge a fuel surcharge or will we be able to receive any other type of compensation because of the rise in fuel prices? RESPONSE: No adjustment will be made. 16. QUESTION: On the bid sheet line item 0008, should 20000 SF be a volume measurement? How Thick? RESPONSE: Yes, 6 to 14. (See revised id schedule) 17. QUESTION: On the bid sheet line item 0009, what is the size of the stem wall? RESPONSE: The size varies from building to building. (See revised id schedule) 18. QUESTION: On the bid sheet line item 0010, 20 concrete pits what is the size? RESPONSE: The size varies (See revised id schedule) A scheduled site visit will be conducted on Tuesday, 19 May 2009, at 10:00 A.M. CT. Participants are required to contact Trish Launius, 270-798-7200, trish.launius@us.army.mil, to register for the site visit. Participants will meet at 10:00 A.M. CT on 19 May 2009 at the Directorate of Contracting, 2172 13 Street, Fort Campbell, KY 42223-5334. Closing date is extended to 05-22-2009 1:00 P.M. CT. Offers must be received NLT 05-22-2009 1:00 P.M. CT. Offers must be mailed or hand delivered to the agency address shown above. Offers received after 05-22-2009 1:00 P.M. CT will not be considered for award and will be rejected. Original Point of Contact Eric Boston, 270-798-7849, e-mail eric.boston@us.army.mil. Current Point of Contact Trish Launius, 270-798-7200, trish.launius@us.army.mil. Contracting Officer Trudy Colbert, 270-798-7566, trudy.colbert@us.army.mil
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABK/DABK09/W9124809BA001/listing.html)
- Place of Performance
- Address: ACA, Fort Campbell Directorate of Contracting, Building 2174, 13.5 & Indiana Streets Fort Campbell KY<br />
- Zip Code: 42223-1100<br />
- Zip Code: 42223-1100<br />
- Record
- SN01823871-W 20090522/090521004453-e0957f0e7a8d4baa072c9d6520b0088f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |