Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 23, 2009 FBO #2735
AWARD

Z -- RECOVERY-Install Sump Pumps

Notice Date
5/21/2009
 
Notice Type
Award Notice
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of the Air Force, Air Force Space Command, 341 CONS, 7015 Goddard Drive, Malmstrom AFB, Montana, 59402, United States
 
ZIP Code
59402
 
Solicitation Number
SABER09-4002
 
Archive Date
6/5/2009
 
Point of Contact
Leslie A. McManious, Phone: 4067314031, Jennifer R George, Phone: 406-731-4001
 
E-Mail Address
leslie.mcmanious@malmstrom.af.mil, jennifer.george@malmstrom.af.mil
(leslie.mcmanious@malmstrom.af.mil, jennifer.george@malmstrom.af.mil)
 
Small Business Set-Aside
N/A
 
Award Number
FA4626-09-D-0002-0009
 
Award Date
5/21/2009
 
Awardee
MCS ENVIRONMENTAL INC, 5562 ALLOY SOUTH, MISSOULA, Montana 59808, United States
 
Award Amount
$386,004.00
 
Line Number
0001
 
Description
This firm fixed price award is against a previously existing mulitiple award SABER IDIQ contract competed under the 8(a) set-a-side program. The contractor shall perform all services necessary to accomplish complete and functional installation of the proposed project. The work shall be in accordance with the SABER contract specifications, associated drawings and additional requirements of the task order statement of work. REQUIREMENT: The Contractor shall provide all labor, material, equipment and incidentals necessary to install sump pumps with high level alarms in the crawl spaces of homes located in Jupiter Village. Major items of work shall consist of: 01 - EXCAVATION: Dirt in the crawl spaces of homes is sloped to a low point. Contractor is to excavate enough soil to allow installation of a sump basin with gravel. Care will need to be taken while hauling excavated soil through the housing units for disposal off base. 02 - Sump Pump: Contractor is to line the excavation with filter fabric. Place an 18" X 24" deep perforated sump basin with at least 4" of washed drainage gavel around all sides and below. Place a 1/3 HP brass sump pump with auto float and pipe discharge to connect into sanitary sewer line stack located in the crawl space. Discharge Pipe will require a check valve. 03 - ELECTRICAL: Contractor will be required to run conduit, wire and associated hardware to install an outlet for the sump pump and a light with switch in the crawl space. Also need to install a high level alarm on sump basin with alarm panel located in the mechanical room. Alarm panel will have both audible and lights signals.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFSC/341CONS/Awards/FA4626-09-D-0002-0009.html)
 
Record
SN01824410-W 20090523/090521234857-5b6c6b3440908dac6f5ec6e2de673dde (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.