FBO DAILY ISSUE OF MAY 24, 2009 FBO #2736
MODIFICATION

P -- Demolition

Notice Date
5/22/2009
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of the Army, Army Contracting Agency, South Region, ACA, Fort Campbell, ACA, Fort Campbell, Directorate of Contracting, Building 2174, 13 ? & Indiana Streets, Fort Campbell, KY 42223-1100
 
ZIP Code
42223-1100
 
Solicitation Number
W9124809BA001
 
Response Due
5/22/2009
 
Archive Date
7/21/2009
 
Point of Contact
SaLonda M. Ozier, 270-798-7810<br />
 
E-Mail Address
ACA, Fort Campbell
(salonda.m.ozier@us.army.mil)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
Description: Questions received from interested participants and our responses follow: 19. Question: The quantities for line items #0008 and #0009 stayed the same when the unit was changed from SF to CY. Did the quantities change this much? They are very much out of proportion from the original bid. If the units were CF the quantities would be about the same. If these two line items are bid at this high quantity of CY they will dominate the bid. RESPONSE: Revised Bid Schedule is atteched 20. Question: Line item #0008 is for pads from 6 to 14 and is measured in CY. If concrete is over 14 thick what line item will be used? RESPONSE: 0008. See Revised Bid Schedule 21. Question: Line item #0009. The outside walls of the Korean War buildings we were shown have 24 x 36 columns every 26 feet with ten or twelve 40 foot lengths of 1 rebar in them. Since the concrete cant be larger than 3 x 2 x 18 when taken to the landfill, does the contractor have to cut all these pieces of rebar that is in the concrete? The cubic yard cost for removing this wall is very different than removing an 8 cinderblock wall with no rebar in it. Is it possible to make two line items for these very different items? RESPONSE: Yes, Shall be required to cut rebar in concrete. See Revised Bid Schedule 22. Question: Line item #0008. The base of the chimney in a Korean War building is a 15 foot octagon that is 3 feet thick and filled with rebar. The cubic yard cost for removing this concrete is very different from the cost of removing an 8 to 10 thick pad with little or no wire in it. Is it possible to make two line items for these very different items? RESPONSE: See Revised Bid Schedule Closing date is extended to 05-27-2009 1:00 P.M. CT. Offers must be received NLT 05-27-2009 1:00 P.M. CT. Offers must be mailed or hand delivered to Mission & Installation Contracting Command, Fort Campbell, Directorate of Contracting, 2172 13 Street, Fort Campbell, KY 42223-5334 (ATT: Trish Launius) and have BID NUMBER W91248-09-B-A-001 DEMOLITION posted on the outside of the envelope. Offers received after 05-27-2009 1:00 P.M. CT will not be considered for award and will be rejected. Original Point of Contact Eric Boston, 270-798-7849, e-mail eric.boston@us.army.mil. Current Point of Contact Trish Launius, 270-798-7200, trish.launius@us.army.mil. Contracting Officer Trudy Colbert, 270-798-7566, trudy.colbert@us.army.mil
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABK/DABK09/W9124809BA001/listing.html)
 
Place of Performance
Address: ACA, Fort Campbell Directorate of Contracting, Building 2174, 13.5 & Indiana Streets Fort Campbell KY<br />
Zip Code: 42223-1100<br />
 
Record
SN01825884-W 20090524/090522234818-7a0b7fd545c41c959e4454bf40fc022b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.