SOLICITATION NOTICE
Z -- RECOVERY-Installation of Power Factor Correcting Load Bank Capacitors
- Notice Date
- 5/22/2009
- Notice Type
- Presolicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of the Air Force, Air Education and Training Command, HQ AFCESA, 139 Barnes Dr, Suite 1, Building 856 Annex, Tyndall AFB, Florida, 32403-5319
- ZIP Code
- 32403-5319
- Solicitation Number
- RAND-08-K-2548(MXDP-09-1030)
- Archive Date
- 5/27/2009
- Point of Contact
- Douglas B. Scripture, Phone: 8502836111, Quincy Meade, Phone: 8502836558
- E-Mail Address
-
douglas.scripture@tyndall.af.mil, quincy.meade1.ctr@tyndall.af.mil
(douglas.scripture@tyndall.af.mil, quincy.meade1.ctr@tyndall.af.mil)
- Small Business Set-Aside
- N/A
- Description
- RECOVERY - "In compliance with the transparency and accountability requirements associated with the supplemental appropriations provided by the American Recovery and Re-Investment Act of 2009, Pub.L. 111-5, the Government posts this presolicitation notice of intent to issue a task order MODIFICATION under an established Indefinite Delivery Indefinite Quantity (IDIQ) type contract task order with Toltest, Inc., a Prime Contractors presently assigned to the Sustainment, Restoration & Modernization Acquisition Task Order Contract (SATOC), which is operated by HQ AETC CONS LGCT Office, c/o HQ AFCESA CONS CEKC at Tyndall AFB, FL. Toltest, Inc., was previously issued the task order to be modified. This notice is provided for INFORMATION PURPOSES ONLY. This task order modification calls for installation of power factor correcting load bank capacitors necessary to bring Laughlin AFB’s electrical utility power factor up to a level where it remains above 95%. Work will also include the installation of load bank capacitors and associated hardware (and software, if necessary) and conductors. The Government intends to issue a task order modification to Toltest, Inc., one of the SATOC Prime Contractors under the SATOC IDIQ, against the existing task order. Toltest, Inc’s., main point of contact is as follows--Companies interested in subcontracting opportunities should contact the POC listed: SATOCToltest, IncErnest Enrique419-794-3596Ernest.enrique@toltest.com The purpose of this project is to install power factor correcting load bank capacitors necessary to bring Laughlin AFB’s electrical utility power factor up to a level where it remains above 95%. The contractor shall provide all engineering, labor, equipment, and materials to install power factor correcting load bank capacitors. Work will include a technical study to determine the ideal quantity, sizes, and locations of capacitor banks necessary to bring Laughlin AFB’s power factor up to a point where it is always above 95%. Work will also include the installation of load bank capacitors and associated hardware (and software, if necessary) and conductors.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/HQAFCESACEKC/RAND-08-K-2548(MXDP-09-1030)/listing.html)
- Place of Performance
- Address: Laughlin AFB, Texas, United States
- Record
- SN01826084-W 20090524/090522235053-269bf8bedee95921e627a5f20e9a2a3f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)