Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 03, 2009 FBO #2746
SOLICITATION NOTICE

Y -- Toilet Demolition/Site Prep/Finish Work

Notice Date
6/1/2009
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-5 IBET Province, Tahoe N.F., 631 Coyote Street, Nevada City, California, 95959-2250
 
ZIP Code
95959-2250
 
Solicitation Number
AG-9A63-S-09-0063
 
Archive Date
10/1/2009
 
Point of Contact
Matthew Gagnon, Phone: 530-478-6826, Rebecca A Peabody, Phone: 530-478-6124
 
E-Mail Address
matthewgagnon@fs.fed.us, rpeabody@fs.fed.us
(matthewgagnon@fs.fed.us, rpeabody@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Toilet Demoliton/Site Prep/finish work Eldorado National Forest This contract includes demolition of toilets; removal of existing steps, handrail, and walkways; preparation of excavated holes for off-loading by a separate contractor of pre-fabricated concrete toilets; back-filling, compacting and finish grading of newly installed toilets; construction of retaining walls; minor clearing; and construction of aggregate base surfaced or asphalt concrete surfaced walkways and turnouts. The major work items include demolition and disposal of eleven (11) 2-unit concrete block toilets with concrete vaults, ten (10) 2-unit wood toilets with concrete vaults, three (3) 4-unit wood toilets with concrete vaults, concrete and wood steps, metal handrail and asphalt walkway; construction of 4,888 sq. ft. of aggregate surfaced turnouts, 1,320 sq. ft. of A/C surfaced turnouts, 875 sq. ft. of aggregate base surfaced walkway, 600 sq. ft. of asphalt concrete surfaced walkway clearing of approximately 15 trees and minor amounts of brush; construction of approximately 150 facial sq. ft. of modular concrete retaining wall, preparation of the holes for the installation of ten (10) single unit and eighteen (18) double unit pre-fabricated toilets (off-load into holes will be done by a separate contractor); backfilling, compacting and finish grading of installed toilets and vacated toilet holes. Close coordination between the toilet installer and the Forest Service shall be essential. Scheduling of toilet deliveries and site preparation shall be at the discretion of the Forest Service. Project Location This project encompasses 12 campgrounds and 1 fire lookout within the boundaries of the Eldorado National Forest, Placerville, CA The Government's estimate is: $100,000 and $250,000. Estimated date for upload of the solicitation is June 15, bid's must be received by 2pm on July 14, 2009. Estimated Start Date September 8, 2009 Technical Contact: David Jones 530-621-5248
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/9A63/AG-9A63-S-09-0063/listing.html)
 
Place of Performance
Address: Eldorado National Forest, Placerville, California, 95667, United States
Zip Code: 95667
 
Record
SN01832043-W 20090603/090601234512-ae739c002b985b81ac54488b60e8f28b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.