Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 10, 2009 FBO #2753
SOURCES SOUGHT

99 -- RECOVERY PROJECT - RESURFACE SOUTH PARKING LOT, AIR ROUTE TRAFFIC CONTROL CENTER, FARMINGTON, MINNESOTA

Notice Date
6/8/2009
 
Notice Type
Sources Sought
 
Contracting Office
Department of Transportation, Federal Aviation Administration (FAA), Great Lakes Region, FEDERAL AVIATION ADMINISTRATION, AGL-55B AGL - Great Lakes
 
ZIP Code
00000
 
Solicitation Number
DTFAGL-09-R-00244
 
Response Due
6/15/2009
 
Archive Date
6/30/2009
 
Point of Contact
Melody McGovern, 847/294-7347<br />
 
E-Mail Address
melody.mcgovern@faa.gov
(melody.mcgovern@faa.gov)
 
Small Business Set-Aside
N/A
 
Description
THE FOLLOWING PROJECT IS COVERED UNDER THE RECOVERY AND REINVESTMENT ACT - THIS PROJECT IS A SMALL BUSINESS SET-ASIDE - NAICS CODE = 238990 = $14.0M The FAA is seeking experienced small business with expertise in parking lot paving to perform the work as described below:A.Furnish all material, equipment, labor, and supervision to accomplish the work described in this specification. The work includes:1.Mill (remove) approximately 6,000 square yards (SY) of the existing asphaltic pavement to a depth of 1.5-inches +/- 1/8-inches. Contractor responsible for all field measurements.2.Removed material will be spread and compacted to 1 inch in the area adjacent to the parking lot as directed by Contracting Officer's Technical Representative (COTR). 3.Seal all joints, cracks, edges, and corners of the pavement area. Fill cracks greater than 1-inch wide, prior to asphalt placement.4.Pave with leveling course.5.Pave with ware course.6.Mix shall meet MNDOT 2360, LVWEB23013 specification.7.After allowing new asphalt surface to cure for a minimum of 30 days, apply one coat of penetrating primer and two coats of sand-slurry sealer.8.South Parking Lot: After seal coat cures, paint parking stalls, arrows, curbs, and other pavement markings as shown on attached project drawing.9.North Parking Lot: Paint parking stalls, arrows, curbs, and other pavement markings per existing. COTR will direct. 10.Replace all handicap signs. Offer range is between $100,000 and $250,000 with a performance time of approximately 90 calendar days. Construction start is anticipated for August 2009. Interested firms should submit a letter of interest to the above named Contracting Officer along with a listing of similar comparable projects performed over the last 5 year period and the Business Declaration Form. Submit this letter via email to melody.mcgovern@faa.gov or fax to 847/294-7801. The Request For Offer is anticipated to be available by June/July 2009. This Notice is for informational purposes for Minority, Women-Owned and Disadvantaged Business Enterprises: The Department of Transportation (DOT), Office of Small and Disadvantaged Business Utilization, has a program to assist small businesses, small businesses owned and controlled by a socially and economically disadvantaged individuals, and women-owned concerns to acquire short-term working capital assistance for transportation-related contracts. Loans are available under the DOT Short Term Lending Program (STLP) at prime interest rates to provide accounts receivable financing. The maximum line of credit is $750,000. For further information and applicable forms concerning the STLP, call the OSDBU at (800) 532-1169.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/GLR/DTFAGL-09-R-00244/listing.html)
 
Record
SN01838649-W 20090610/090608234854-a4b0b50b3c8f2fc834deb3e1558c2626 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.