MODIFICATION
Y -- Department of State 2009 Construction Services for U.S. Embassy Rome Italy - MSGQ Construction & Multi-purpose Room Improvements - Amendment 1
- Notice Date
- 6/9/2009
- Notice Type
- Modification/Amendment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of State, Office of Logistics Management, Acquisition Management, P.O. Box 9115, Rosslyn Station, Arlington, Virginia, 22219
- ZIP Code
- 22219
- Solicitation Number
- SAQMMA-09-R0074
- Archive Date
- 7/24/2009
- Point of Contact
- Tyler E. Sinclair, Phone: 703-875-6110, Tyler E. Sinclair, Phone: 703-875-6110
- E-Mail Address
-
sinclairte@state.gov, sinclairte@state.gov
(sinclairte@state.gov, sinclairte@state.gov)
- Small Business Set-Aside
- N/A
- Description
- Past Performance Questionairre SAQMMA09R0074 Department of State 2009 Construction Services for U.S. Embassy Rome Italy Notice of Solicitation of Submissions for Contractor Pre-Qualification This announcement hereby cancels the announcement posted previously under this SAQMMA09R0074 on April 3, 2009. Any offerors that wish to be considered will need to submit a new proposal in accordance with the announcement below. Previously submitted offers will not be considered. THE U.S. DEPARTMENT OF STATE (DOS), Bureau of Overseas Buildings Operations (OBO) is requesting submissions to pre-qualify firms for construction services for the partial renovation and upgrade of the existing facilities at the U. S. Embassy in Rome, Italy. The renovation will include the Marine Security Guard Quarters (MSGQ) and the multi-purpose room located on the Embassy Rome compound in the Sembler building. This construction project will complete the MSGQ construction and the multi-purpose room improvements. The original U.S. government-owned, 4-acre and buildings were acquired by the Department in 1946. Portions of the 12,700 gsm chancery were constructed in the 1600s. The twin consular and public diplomacy buildings each contain 2,500 gsm of floor space. An additional parcel and office space were acquired and added to the compound in FY 2003. The building was designed in 1927 for the INA Insurance Company and was occupied by the company until the sale. Its 2 ˝ acre trapezoidal site forms a natural corner to our embassy compound and brings the total compound size to 6.5 acres. Project Description: Security Clearance is NOT Required SAQMMA-09-R0074 Rome, Italy– Complete the MSGQ construction and the multi-purpose room improvements. Estimated construction cost is $2 to $5 million. Acquisition Phase I – Pre-Qualification of Offerors This announcement of solicitation of pre-qualification submissions is Phase I. DOS will evaluate and rate the pre-qualification submissions based on the procedure and evaluation criteria set forth below. DOS may refuse to pre-qualify any Offeror receiving less than a satisfactory rating on any evaluation factor or sub-factor. Acquisition Phase II – Requests for Proposals from Pre-Qualified Offerors Those Offerors determined to be pre-qualified in accordance with this notice will be issued a formal Request for Proposal (RFP) for the project and invited to submit proposed pricing in Phase II. The RFP will include a statement of work, final design documents and outline specifications that set out the project scope, construction process, post-construction activities; unique site constraints and requirements for maintaining security and operations during construction.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/State/A-LM-AQM/A-LM-AQM/SAQMMA-09-R0074 /listing.html)
- Place of Performance
- Address: US Embassy in Rome. Italy, Rome, Italy
- Record
- SN01839596-W 20090611/090609235029-4031e1d5b0512224a8399e6ff59fb280 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |