AWARD
Y -- RECOVERY--Y--Pier 23 Replacement Project, Tacoma, Washington
- Notice Date
- 6/10/2009
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Louisville, US Army Corps of Engineers, Louisville, 600 Dr. Martin Luther King, Jr. Place, Room 821, Louisville, KY 40202-2230
- ZIP Code
- 40202-2230
- Solicitation Number
- W912QR-09-R-0045
- Response Due
- 5/21/2009
- Archive Date
- 7/20/2009
- Point of Contact
- Erin Quinn-Neuendorf, 502-315-6205<br />
- E-Mail Address
-
US Army Corps of Engineers, Louisville
(erin.g.quinn@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912QR-09-C-0038
- Award Date
- 6/5/2009
- Awardee
- General Construction Company, 19472 Powder Hill Place NE, Poulsbo, WA 98370
- Award Amount
- 18388075
- Line Number
- Line Items 0001-0003
- Description
- This project consists of the demolition of 600-feet of existing timber pier and replacement with 600-feet of concrete pier. The existing pier is approximately 1200 feet long and consists of two main segments: an inner 600-foot long timber segment and an outer 600-foot long concrete segment. The inner 600-foot long timber segment is being replaced with a concrete pier. The timber pier segment was constructed in the mid 1940s. The new concrete pier consists of pre-cast concrete piles, cast-in-place pile caps and pre-cast decking. Utilities will be provided on the new concrete pier. An environmental remediation component is also part of this project. The remediation will consist of removal of in water sediments and slag. The cleanup area encompasses approximately 1.2 acres of the near shore sediments and slag. Supporting facilities include addition to existing riser building, pavement patching, temporary fencing and extension of a new electric service to the pier. The solicitation will contain the following as options: Option 1 All labor, equipment and materials required to remediate the near shore contaminated soils and slag. The remediation will consist of removal of the contaminated sediment and replacement with clean soil. Option 2 - All labor, equipment and materials associated with providing temporary access to the outer pier during construction. Contract duration is 365 days and all in-water work such as pile demolition, pile installation and sediment/slag cleanup will be complete in one fish window.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-09-R-0045/listing.html)
- Record
- SN01841800-W 20090612/090611000053-ab447ca4d3a4366fac8fc9eb2ab07e30 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |