Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 13, 2009 FBO #2756
AWARD

M -- RECOVERY--M--Modification Award Notice - Dewater, Clean, Repair and Paint Spillway Gates at Coffeeville, Holt and Bank Head Dam

Notice Date
6/11/2009
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, US Army Engineer District, Mobile, US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-09-38-ARRA
 
Archive Date
8/24/2009
 
Point of Contact
Helene Mitchell, 2514416531<br />
 
E-Mail Address
US Army Engineer District, Mobile
(helene.s.mitchell@sam.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-06-C-0038 P00073
 
Award Date
6/10/2009
 
Awardee
R&D Maintenance Services, Inc., 409 N Main St., Hennessey, OK 73742
 
Award Amount
421637
 
Line Number
0010,0011, 0012
 
Description
This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Furthermore: 1) The contractor must work in conjunction with government operated floating plant and personnel in order to set stop logs to de-water the structures. 2) A detailed scope of work can not be prepared. The extent of the work and the resources needed can not be fully determined prior to setting the stop logs, de-watering, cleaning to remove scum, silt, and debris, and inspection. 3) The required repairs could be extensive and require specialized expertise and equipment. Miter gates weighing up to 365 tons may require disconnection from anchorage and jacking for repair. Miter gates may also require specialized alignment for positioning; removal and installation of contact blocks; stressing of steel diagonals; and line bores of up to 13 inch diameter for gudgeon and anchor pin replacement. The amount of necessary repairs cannot be determined prior to the closure and inspections. 4) This contract enables repairs to begin immediately after and even during the inspections without a detailed scope of work so as to minimize the time the facilities are closed thus minimizing the impact on commercial shipping and the economy.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-09-38-ARRA/listing.html)
 
Record
SN01842501-W 20090613/090611235634-a3f9aa3498f32c6288ef9913288172cc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.