AWARD
Z -- Recovery Repair Roof - Munitions Armament (B88240)
- Notice Date
- 6/15/2009
- Notice Type
- Award Notice
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- Department of the Air Force, Air Combat Command, 28 CONS, 1000 Ellsworth Street, Suite 1200, Ellsworth AFB, South Dakota, 57706-4904
- ZIP Code
- 57706-4904
- Solicitation Number
- FA4690-09-R-K107
- Archive Date
- 6/22/2009
- Point of Contact
- David L. Mendelsohn, Phone: 605-385-1748
- E-Mail Address
-
david.mendelsohn@ellsworth.af.mil
(david.mendelsohn@ellsworth.af.mil)
- Small Business Set-Aside
- N/A
- Award Number
- FA4690-05-D-K100-5906
- Award Date
- 6/15/2009
- Awardee
- Roof Tech, Inc., 406 Box Elder Road W, Box Elder, South Dakota 57719, United States
- Award Amount
- $242,988.33
- Line Number
- 0005, 0005BF, 0005BG, 0005CA, 0005CC, 0005CH, 0005EE, 0005FB, 0005FE, 0005GG, 0005GK, 0005GL, 0005GR, 0005GS, 0005HA, 0005HB, 0005JA, 0005JB, 0005JD, 0005JE, 0005KE, 0005KF, 0005MC, 0005ML, 0005MM, 0005MN, 0005NC, 0005ND, 0006, 0007, 0008
- Description
- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE EXISTING IDIQ ROOFING CONTRACT. REPAIR ROOF - MUNITIONS ARMAMENT (B88240). Principle items of work are described as follows: a. Remove existing BUR (Built Up Roof), gravel, insulation and flashing down to the deck on areas A, D & E. Areas A & E have a metal deck. Area D has a structural concrete deck. Remove gutters, downspouts and fascia metal. b. Attach or remove wood blocking as necessary to match new insulation thickness. c. Install 3" of flat polyisocyanurate insulation. Fasten insulation to deck in accordance with manufacturer's requirements. d. Install fully-adhered 60 mil EPDM roof system including manufacturer-furnished attachment, cover strips, adhesives, seams, edge and accessories. Install membrane on parapet walls and under coping. Provide 20 year manufacturer's system warranty. e. Re-install existing counter flashing. Install new Kynar-finished steel gravel stop, fascia, coping, gutters and downspouts. f. Flash membrane around all ventilators, hoods, stacks and penetrations in accordance with membrane manufacturer's recommendations. g. Remove/replace/attach existing lightning protection system to new EPDM roof system in accordance with roof manufacturer's recommendations.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/28CONS/Awards/FA4690-05-D-K100-5906.html)
- Record
- SN01844676-W 20090617/090615234602-2ff839b894f8c506dfbfda9c31900bdf (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |