Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 17, 2009 FBO #2760
AWARD

Z -- Recovery Repair Roof - Munitions Armament (B88240)

Notice Date
6/15/2009
 
Notice Type
Award Notice
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
Department of the Air Force, Air Combat Command, 28 CONS, 1000 Ellsworth Street, Suite 1200, Ellsworth AFB, South Dakota, 57706-4904
 
ZIP Code
57706-4904
 
Solicitation Number
FA4690-09-R-K107
 
Archive Date
6/22/2009
 
Point of Contact
David L. Mendelsohn, Phone: 605-385-1748
 
E-Mail Address
david.mendelsohn@ellsworth.af.mil
(david.mendelsohn@ellsworth.af.mil)
 
Small Business Set-Aside
N/A
 
Award Number
FA4690-05-D-K100-5906
 
Award Date
6/15/2009
 
Awardee
Roof Tech, Inc., 406 Box Elder Road W, Box Elder, South Dakota 57719, United States
 
Award Amount
$242,988.33
 
Line Number
0005, 0005BF, 0005BG, 0005CA, 0005CC, 0005CH, 0005EE, 0005FB, 0005FE, 0005GG, 0005GK, 0005GL, 0005GR, 0005GS, 0005HA, 0005HB, 0005JA, 0005JB, 0005JD, 0005JE, 0005KE, 0005KF, 0005MC, 0005ML, 0005MM, 0005MN, 0005NC, 0005ND, 0006, 0007, 0008
 
Description
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE EXISTING IDIQ ROOFING CONTRACT. REPAIR ROOF - MUNITIONS ARMAMENT (B88240). Principle items of work are described as follows: a. Remove existing BUR (Built Up Roof), gravel, insulation and flashing down to the deck on areas A, D & E. Areas A & E have a metal deck. Area D has a structural concrete deck. Remove gutters, downspouts and fascia metal. b. Attach or remove wood blocking as necessary to match new insulation thickness. c. Install 3" of flat polyisocyanurate insulation. Fasten insulation to deck in accordance with manufacturer's requirements. d. Install fully-adhered 60 mil EPDM roof system including manufacturer-furnished attachment, cover strips, adhesives, seams, edge and accessories. Install membrane on parapet walls and under coping. Provide 20 year manufacturer's system warranty. e. Re-install existing counter flashing. Install new Kynar-finished steel gravel stop, fascia, coping, gutters and downspouts. f. Flash membrane around all ventilators, hoods, stacks and penetrations in accordance with membrane manufacturer's recommendations. g. Remove/replace/attach existing lightning protection system to new EPDM roof system in accordance with roof manufacturer's recommendations.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/28CONS/Awards/FA4690-05-D-K100-5906.html)
 
Record
SN01844676-W 20090617/090615234602-2ff839b894f8c506dfbfda9c31900bdf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.