MODIFICATION

Y -- RECOVERY - MAINTENANCE DREDGING PAGAN RIVER, HAMPTON CREEK, AND HERBERTS CREEK

Notice Date
6/16/2009
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Norfolk, 803 Front Street, Norfolk, Virginia, 23510-1096
 
ZIP Code
23510-1096
 
Solicitation Number
W91236-09-B-0014
 
Archive Date
8/6/2009
 
Point of Contact
Tracey J. Hughes, Phone: 757-201-7131
 
E-Mail Address
Tracey.J.Hughes@usace.army.mil
(Tracey.J.Hughes@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
PRE-SOLICITATION NOTICE TIMEFRAME SHORTENED. SOLICITATION AVAILABLE: 22 JUNE 2009 BIDS DUE: 22 JULY 2009 THIS IS AN UNRESTRICTED PROCUREMENT Project Description - The entire work for this contract consists of dredging two locations as part of the American Recovery and Reinvestment Act (ARRA). All ARRA funds must be expended by 30 September 2010. The first location of work, Part 1, consists of dredging Pagan River by bucket or clamshell dredge and transport of dredged material by bottom dumping barges and scows and placement in the Craney Island Rehandling Basin at the Craney Island Dredged Material Management Area. The work consists of dredging to a depth of 7 feet below Mean Lower Low Water (MLLW) with 2 feet of allowable overdepth. Total estimated amount of material to be dredged, including allowable overdepth and estimated accretion, is 65,000 cubic yards. All work must be completed and accepted at the Pagan River location before moving to the next location. The next location of work, Part 2, consists of dredging the Hampton Creek and Herberts Creek Channel by bucket or clamshell dredge and transport of dredged material by bottom dumping barges and scows and placement in the Craney Island Rehandling Basin at the Craney Island Dredged Material Management Area. The work consists of dredging to a depth of 12 feet below Mean Lower Low Water (MLLW) with 2 feet of allowable overdepth. Total estimated amount of material to be dredged, including allowable overdepth and estimated accretion, is 55,000 cubic yards. CLIN 0001 - P art 1, Maintenance Dredging Pagan - Begin performance within 15 calendar days and complete all work within 120 calendar days of receipt of Notice To Proceed (NTP). CLIN 0002 - Part 2, Maintenance Dredging Hampton Creek and Herbert's Creek - Begin performance within 15 calendar days and complete all work within 75 calendar days of receipt of Notice To Proceed (NTP). LIQUIDATED DAMAGES: $400.00 per day MAGNITUDE OF CONSTRUCTION: $1,000,000.00 - $2,500,000.00 A SUBCONTRACTING PLAN IS REQUIRED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA65/W91236-09-B-0014/listing.html)
 
Place of Performance
Address: Virginia, United States
 
Record
SN01846477-W 20090618/090616235957-cab49f3bf6a752d29772cb1dc0e0e13d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.