Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 18, 2009 FBO #2761
AWARD

Z -- RECOVERY_Construct Overflow Parking Lot

Notice Date
6/16/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Air Force, Air Force Space Command, 460 CONS / LGC, 460 CONS / LGC, 510 S. Aspen St. (MS 92), Bldg 1030, Rm 120, Buckley AFB, Colorado, 80011-9572, United States
 
ZIP Code
80011-9572
 
Solicitation Number
FA2543091010
 
Archive Date
6/24/2009
 
Point of Contact
Lana E. Skinner, Phone: 720-847-6975, Robert B. Woodruff, Phone: 720-847-9313
 
E-Mail Address
lana.skinner@buckley.af.mil, robert.woodruff@buckley.af.mil
(lana.skinner@buckley.af.mil, robert.woodruff@buckley.af.mil)
 
Small Business Set-Aside
N/A
 
Award Number
FA2543-05-D-0004-5095
 
Award Date
6/9/2009
 
Awardee
DWG & Associates, Inc., 2270 La Montana, Colorado Springs, Colorado 80918, United States
 
Award Amount
$312,020.00
 
Description
Construct a parking lot to accommodate 83 vehicles as designed for the Wing HQ. Construction of parking lot to include driveway entrance and sidewalks. Lot base course shall meet at a minimum 200 psi unconfined compressive strength. This can be accomplished using soil amendments such as cement, lime, or flyash. Lot shall consist at a minimum of 8 inches of class VI base course or equal material overlain by at least 4 inches of hot asphalt mix. Asphalt shall be placed in a 2.5-1.5 inch layered format with seal coat being applied between each layer. Lot area shall be over excavated to a depth of 8 inches backfilled, and compacted prior to base course and asphalt construction. All compacted materials shall meet 95% densities as defined by ASTM stds. Entire lot shall include a concrete perimeter curb specifically to bound lot from existing roadway and other existing terrain features. Curb cuts shall be installed where existing sidewalk and roadway intersect lot entranceway. No concrete stall stops or concrete traffic controls shall be constructed within parking lot. Install 5 feet wide sidewalks. Lot shall have 18'x9' foot stalls and be marked with 4 inch white marker paint. Lot shall also have painted traffic controls and shall be hashed with 4 inch yellow marker paint. Add 5 handicap signs. Sign post and back side of post shall be painted brown. Painted parking detail pictogram shall not be performed. Install 2 lights. Detail of parking lot lights are shown in drawings. Deliver and install 8 bollard lights. Construction shall include 2 sets of as-built drawings in digital and hardcopy formats. All work accomplished will be IAW EPA construction general permit.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFSC/821CONS/Awards/FA2543-05-D-0004-5095.html)
 
Record
SN01846721-W 20090618/090617000314-463219bf58301a5f07700078f09a861b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.