Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 21, 2009 FBO #2764
SOLICITATION NOTICE

Y -- Francis Creek Bridge Construction

Notice Date
6/19/2009
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Southwestern Oregon ZAP, Umpqua NF, 2900 NW Stewart Parkway, Roseburg, Oregon, 97470
 
ZIP Code
97470
 
Solicitation Number
AG04T1S090027
 
Point of Contact
Julie Merritt, Phone: 5419573441, Claudia Halkyard, Phone: 5419573222
 
E-Mail Address
jmerritt@fs.fed.us, chalkyard@fs.fed.us
(jmerritt@fs.fed.us, chalkyard@fs.fed.us)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
Project consists of removing existing culverts and construction of a new bridge on Forest Service Road 28 on the Tiller Ranger District, Umpqua National Forest, in Douglas County, OR. The work includes: traffic management; retrieval, re-decking, construction, removal and re-installation of a bypass bridge and road; excavation and removal of 3 adjacent metal pipe culverts from the forest; construction survey and staking; driving pile foundations; dewatering, erosion and sediment control measures; construction of one precast prestressed concrete bridge; sorting and placement of riprap and stream simulation rock; seeding and mulching of disturbed areas; re-establishing the roadway to the existing alignment; and replacement of the existing aggregate base and asphalt concrete surface. Contractor shall furnish the necessary personnel, material, equipment, services and facilities to perform the Statement of Work/Specifications. Price range is between $250,000.00 and $500,000.00. This proposed procurement is a Total HUBZone Business set aside per FAR 19.1305. The solicitation will be a Request For Proposal (RFP) requiring both a price and technical proposal responding to the evaluation criteria as shown in the solicitation. Solicitation will be available for downloading from this website on or about July 15, 2009. Estimated start work date is October 1, 2009; however, all ground disturbing construction activity shall be performed during the period between July 15, 2010 and September 30, 2010 inclusive.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04T1/AG04T1S090027/listing.html)
 
Place of Performance
Address: This project is located on the Tiller Ranger District on the Umpqua National Forest, Township 29 South, Range 1 West, Section 34, near Tiller, OR. From I-5 south, take exit 98 toward Canyonville/Days Creek. Follow Tiller-Trail Hwy/OR-227/County road 1 for 23 miles. Turn left onto South Umpqua Rd./County Road 46 for 6.25 miles. At this point the road changes to Forest Service 28. Continue on Forest Service Road 28 for 3.75 miles to the project site., Tiller, Oregon, 97484, United States
Zip Code: 97484
 
Record
SN01850407-W 20090621/090619235350-deeb90557b3bd7631d6e5d972b2330b3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.