Z -- Partial renovation of Vares Elementary School in Vares, Bosnia based on the seal bid process.

Notice Date
6/22/2009
 
Notice Type
Presolicitation
 
NAICS
236118 — Residential Remodelers
 
Contracting Office
Department of the Army, ACA, US Army Contracting Command Europe, ACA, JCC-Bondsteel, Kosovo, ACA, JCC-Bondsteel, Kosovo, ATTN: AEUCC-S3, Unit 29331, APO, AE 09266-0509
 
ZIP Code
09266-0509
 
Solicitation Number
W912SR-09-B-4000
 
Response Due
6/26/2009
 
Archive Date
8/25/2009
 
Point of Contact
Abe Curry, 49-9641-83-8715<br />
 
E-Mail Address
ACA, JCC-Bondsteel, Kosovo
(abe.curry@eur.army.mil)
 
Small Business Set-Aside
N/A
 
Description
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912SR-09-B-4000. This procurement will be acquired under FAR 6.302-2, Unusual and Compelling Urgency in order to make the necessary repairs at Vares Elementary School in Vares, Bosnia. Also special note the correct SOLICITATION number is W91253-09-B-4001. Draft Scope of Work and Draft ESTIMATED BILL OF MATERIALS AND QUANTITIES DRAFT SOW 1. DESCRIPTION: Partial renovation of Vares Elementary School in Vares Bosnia and Herzegovina. The contractor shall replace all existing outer joinery of the school with new aluminium anodized joinery, repair all damaged areas of the school faade and paint it, remove all existing gutters and replace with new ones as well as replace all inner and outer window sills. 2. LOCATION: The school is located in Vares, Federation of BiH, Bosnia and Herzegovina. 3. ALUMINIUM JOINERY WORKS: The Contractor shall remove and dispose of all existing wooden joinery on the outer walls of the school. The Contractor shall provide and install new anodized aluminium joinery to replace the old removed wooden joinery, as well as provide and install inner and outer window sills. 4. FAADE WORKS: The Contractor shall brake off all damaged areas of the existing faade on the outer walls of the school building (approximately 40-45% of total faade area), repair the exposed areas with plaster and paint the whole faade. 5. TINSMITHERY WORKS: The Contractor shall dismantle and remove all existing gutters, as well as provide and install new replacement gutters, as well as all tin metal fascia in different areas of the school. 6. DURATION OF PROJECT: The entire project shall be completed within 50 calendar days from the date of contract award. Draft ESTIMATED BILL OF MATERIALS AND QUANTITIES NOTE: THE CONTRACTOR IS TO UNDERSTAND THAT ALL THE MATERIALS AND QUANTITIES LISTED IN THIS ATTACHMENT ARE ESTIMATES ONLY, AND THAT THEY DO NOT REFLECT THE ACTUAL QUANTITIES OR MATERIAL SPECIFICATIONS TO BE USED FOR THIS PROJECT. 1.ALUMINIUM JOINERY WORKS The contractor shall dismantle all existing wooden joinery along with the internal and external window sills and properly dispose of it to a location outside of school yard, as arranged with the school repre-sentatives and local laws and regulations. The contractor shall provide and install new anodized aluminium joinery made of aluminium profiles with a thermal break and thermo-insulated glass 4+12+4 mm, in accordance with Attachment 2 Technical Drawings. The bottom sections of all windows shall have a ventus opening and shall be frosted glass sand type. The price shall include delivery and installation of internal PVC window sills (white) as well as external zinc-plated metal sills. The contractor shall repair all internal and external window edges around the newly installed windows, in order to bring it in the initial state. All joinery shall be manufactured based on the measurements taken on the spot. 01Four-wing window with two upper section wings opening around vertical axis and two bottom section wings opening around the horizontal axis 2400 x 2300 mm102EA 02Four-wing window with two upper section wings opening around vertical axis and two bottom section wings opening around the horizontal axis 1600 x 2300 mm16EA 03Single-wing window opening around both axis 900 x 900 mm21EA 04Double-wing window with one wing opening around both axis and the other is fixed wing 1600 x 900 mm3EA 05Double-wing window with one wing opening around both axis and the other is fixed wing 1600 x 1500 mm1EA 06Entrance double door with fixed door jamb and transom 3500 x 3200 mm1EA 07Window opening around the bottom horizontal axis 1300 x 500 mm4EA 08Stairway glass wall with six window sections opening around both horizontal and vertical axis 4000 x 9000 mm2EA 09Glass wall with two window sections opening around both horizontal and vertical axis 4000 x 2100 mm2EA 10Slide window 1000 x 700 mm1EA 11Single-wing window opening around vertical axis 600 x 500 mm1EA 12Single-wing door without transom 1200 x 2200 mm1EA 13Single-wing door without transom 900 x 2200 mm2EA 14Double door 1500 x 3200 mm1EA 15Glass wall with one window section opening around both horizontal and vertical axis 1600 x 2300 mm2EA 16Glass wall with one window section opening around both horizontal and vertical axis 1600 x 3300 mm3EA 17Glass wall with two window sections opening around both horizontal and vertical axis 1600 x 5200 mm1EA 2.FAADE WORKS 01Braking off of all damaged faade plaster, apply preparatory cement layer and then finally apply rough and fine plaster faade. Estimation of damaged faade plaster area is 40-45% of the total faade area. 880m2 02Impregnation of total faade area 1970m2 03Application of one layer of universal faade glue (type equal or similar to Baumit or Knauf) with wire mesh, as well as final preparation works for plastering works1820m2 04Impregnation or application of preparatory coating for plastering works1820m2 05Application of scrubbed acrylic faade color to be determined by the school repre-sentatives; equal or similar to type Jub or Baumit or Knauf1820m2 06Construction of stone and concrete collar strip Soklo type around the school from bottom up to 60 cm in height type of stone and color to be determined by the school representatives 150m2 3.TINSMITHERY WORKS 01Procurement and installation of hanging zinc-plated 0.55 mm thickness gutters, to in-clude all required fittings, hooks and painting. 140m 02Procurement and installation of horizontal zinc-plated 0.55 mm thickness gutters, to include all required fittings, hooks and painting. 160m 03Procurement and installation of tin fascia made of zinc-plated metal sheets of d=0.55 mm at various location throughout the school building i.e. above main school en-trance, terrace, other entrances and garage, all in different sizes. The price shall in-clude dismantling and proper disposal of all existing tin metal fascia. 77m
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABN/DABN53/W912SR-09-B-4000/listing.html)
 
Place of Performance
Address: ACA, JCC-Bondsteel, Kosovo ATTN: AEUCC-S3, Unit 29331 APO AE<br />
Zip Code: 09266-0509<br />
 
Record
SN01852559-W 20090624/090623000044-5f56592ad391a54ed66ab6215acc21e0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.