Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 27, 2009 FBO #2770
SOLICITATION NOTICE

Z -- RECOVERY--Z--RECOVERY WORK- DALE HOLLOW CONCRETE REPAIRS PROJECT 111261

Notice Date
6/25/2009
 
Notice Type
Presolicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Nashville, USA Engineer District, Nashville, P.O. Box 1070, 801 Broad Street, Nashville, TN 37202-1070
 
ZIP Code
37202-1070
 
Solicitation Number
W912P509B0015
 
Response Due
7/25/2009
 
Archive Date
9/23/2009
 
Point of Contact
James Choate, 615-736-7946<br />
 
E-Mail Address
USA Engineer District, Nashville
(James.E.Choate@LRN02.usace.army.mil)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
RECOVERY--THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER W912P509B0015. PRE-SOLICITATION NOTICE Dale Hollow Dam Concrete Repair This project involves repairs to deteriorated concrete at the Dale Hollow Dam in Celina, Tennessee. Locations to be repaired include the roadway curbing, low parapet wall, high parapet wall, and tainter gate inspection platforms. The Contractor shall furnish all labor, materials, and equipment required to remove and replace deteriorated concrete from approximately 1000 linear feet of curb, 500 linear feet of low parapet wall, 50 linear feet of high parapet wall, and 100 square feet of inspection platforms. The total amount of concrete is approximately 75 cubic yards. The Contractor will be responsible for saw cutting around areas of damaged concrete, removing material down to sound concrete (without damaging existing reinforcing steel) and placing concrete repair material. As part of the repair work, existing steel posts and handrails will need to be removed. The posts and handrails shall be retained without damage and reinstalled after making the necessary concrete repairs. There are two lanes of traffic across the dam. Only one lane of traffic may be closed to traffic at any given time. Estimated order of magnitude is between $250,000 and $500,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P509B0015/listing.html)
 
Place of Performance
Address: USA Engineer District, Nashville P.O. Box 1070, 801 Broad Street Nashville TN<br />
Zip Code: 37202-1070<br />
 
Record
SN01856483-W 20090627/090625235536-00af1c2416e206d211f848a7675d639a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.