AWARD
Z -- RECOVERY -- VKAG 96-1009 Repair Electrical Feeder Phase V RECOVERY -- VKAG 96-1100 Repair Electrical Feeder Phase VI
- Notice Date
- 6/30/2009
- Notice Type
- Award Notice
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of the Air Force, Air Combat Command, 4 CONS, 1695 Wright Brothers Ave, Seymour Johnson AFB, North Carolina, 27531
- ZIP Code
- 27531
- Solicitation Number
- FA4809-09-R-0011
- Point of Contact
- Matthew r Rowe, Phone: 919-722-5421, Bobbie White, Phone: 919-722-5602
- E-Mail Address
-
matthew.rowe@seymourjohnson.af.mil, bobbie.white@seymourjohnson.af.mil
(matthew.rowe@seymourjohnson.af.mil, bobbie.white@seymourjohnson.af.mil)
- Small Business Set-Aside
- N/A
- Award Number
- FA4809-09-C-C003
- Award Date
- 6/30/2009
- Awardee
- M-W Electric, Inc., 312 W 4th Ave, Red Springs, North Carolina 28377, United States
- Award Amount
- $1,588,714.32 (Inclusive of Phase 5 Base Bid and Bid Option 1 / Phase 6 Base Bid)
- Line Number
- Phase 5 Base Bid and Bid Option 1 / Phase 6 Base Bid
- Description
- RECOVERY - VKAG 96-1009 REPAIR ELECTRICAL FEEDER - PHASE V RECOVERY - VKAG 96-1100 REPAIR ELECTRICAL FEEDER - PHASE VI This notice of award is for the Repair of Electrical Feeders V and VI, Projects Number VKAG 96-1009, Repair Electrical Feeder V and VKAG 96-1100, Repair Electrical Feeder VI on Seymour Johnson Air Force Base, NC. This is a Firm Fixed-Price construction contract award, which was awarded to M-W Electric Inc on a sole source basis under the Small Business Administration (SBA) Section 8(a) sole source procedures. The project was accepted by the SBA as a sole source requirement for the 8(a) program on 7 Apr 09. Principal features of this project includes work, but is not limited to the following: 1. Remove existing 7200/12470 V overhead primary conductors, power distribution poles, pole mounted switches and transformers, overhead secondary, pole mounted lights and all associated pole hardware for the area indicated on the drawings. Install new underground primary conductors in concrete encased duct bank. Install new underground secondary circuits. 2. Contractor shall be responsible for contracting directly with BellSouth and Time Warner Cable to have each respective utility relocate existing overhead lines to underground. Contractor shall include direct cost estimate from each utility for the cost of the relocation in Contractor's proposal. 3. Provide and install various single and three-phase pad mounted transformers, pad mounted switches, and associated primary and secondary circuits as detailed on the drawings. Trench and backfill for all new electrical conduits installed as part of this project. 4.4 Provide and install new aluminum street lighting poles and fixtures and all associated conduits and wiring. The breakout for the respective project is shown below: Feeder V: Base Bid Item 0001--$754,263.05; Option 1 Item 0002--$51,849.11 Feeder VI: Base Bid Item 0004--$782,602.16
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/4CONS/Awards/FA4809-09-C-C003.html)
- Record
- SN01860865-W 20090702/090630235749-3d5d9f5b9921a358a8c834a8ef0d1427 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |