Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 02, 2009 FBO #2775
SOLICITATION NOTICE

Y -- Casecade Trail Bridges

Notice Date
6/30/2009
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Forest Service - R-4 SW Idaho/Nevada Acquisition Office
 
ZIP Code
00000
 
Solicitation Number
AG-0261-S-09-0058
 
Archive Date
10/30/2009
 
Point of Contact
Dan Bullock, Phone: 208 373 4127
 
E-Mail Address
dbullock@fs.fed.us
(dbullock@fs.fed.us)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
The Cascade Trail Bridge Project package will be available for viewing and printing in approximately 15 days. This project consists of design, supply, and construction of three prefabricated weathering steel trail bridges on National Forest System Trails (NFST) near Cascade, Idaho. The three sites are Lodgepole Creek, Bear Creek, and the North Fork of Dollar Creek. Major items of work include: structure excavation and backfill; sediment control; clearing and grubbing; design, furnish and install three prefabricated weathering steel bridges; precast concrete footings; furnish and place riprap. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies; and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer’s shop drawings, and as described in the Standard Specifications (FP-03) and Forest Service Supplemental Specifications (FSSS). The 3 project sites are located on the Cascade Ranger District, Boise National Forest, Valley County, Idaho. The Lodgepole Creek site is located off of National Forest System Road (NFSR) #472 at Milepost 0.7. The Bear Creek site is located off of NFSR #470 at mile post 1.9. The North Fork Dollar Creek site is on NFSR #495 at Milepost 0.8. From Boise, take State Highway 55 to Cascade, take a right on Warm Lake Hwy, follow for approximately 23 miles to MP 56.9. For the Lodgepole and Bear Creek sites take a right on NFSR #474.2. For the Bear Creek site follow NFSR #474.2 for approximately 2.9 miles then turn left on NFSR #470 and follow for approximately 1.9 miles, the project location will be on the south side of the road. For the Lodgepole Creek site follow NFSR #474.2 for approximately 4.9 miles then turn left on NFSR #472 and follow for approximately 0.7 miles, the project location will be on the south side of the road. To access the North Fork Dollar Creek site continue on Warm Lake Highway from NFSR #472.2 to MP 57.2; take a left on NFSR #474 and follow for approximately 5.8 miles, turn left on NFSR #493 follow for approximately 0.1 miles, continue straight on NFSR # 495 and follow for approximately 0.7 miles, the project site will cross the North Fork of Dollar Creek at this location. Estimated Cost is between $100,000 and $250,000. Estimated Start date is September 1, 2009. THIS PROJECT IS 100% HUBZONE SET-ASIDE
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-09-0058/listing.html)
 
Record
SN01861736-W 20090702/090701001611-e55ab1f33a113e526d4241ed97b8bf07 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.