SOURCES SOUGHT
99 -- DTFANM-09-R-00108 - Walk-In-Freezer/Refrigerator Floor Replacement - Oakland ARTCC, Fremont, CA
- Notice Date
- 7/7/2009
- Notice Type
- Sources Sought
- Contracting Office
- Department of Transportation, Federal Aviation Administration (FAA), Northwest-Mountain Region, FEDERAL AVIATION ADMINISTRATION, ANM-52 ANM - Northwest Mountain
- ZIP Code
- 00000
- Solicitation Number
- DTFANM-09-R-00108
- Response Due
- 8/10/2009
- Archive Date
- 8/25/2009
- Point of Contact
- Gary Yount, (425) 227-1177<br />
- E-Mail Address
-
gary.yount@faa.gov
(gary.yount@faa.gov)
- Small Business Set-Aside
- N/A
- Description
- The purpose of this web posting is to solicit offers for the subject project. Full project details are available for download from this website, including the Request for Offers (RFO)--which contains contract clauses and requirements for submitting an offer--and the Technical Specification. - Davis Bacon Act wage rates apply. - Estimated total value: Between $15,000 and $20,000. - The NAICS Code for this project will be 811310. - There is a optional site visit on July 23, 2009 at 9:00 AM local time. - OFFERS ARE DUE NO LATER THAN 4:00 PM local time on August 6, 2009. DOWNLOADS:1. RFO - DTFANM-09-R-00108 - Oakland ARTCC Refrigerator-Freezer Floor Replacement.pdf2. J001 - Davis-Bacon Act Wage Determination GENERAL DECISION (Alemeda).pdf3. J002 - Technical Specification - DTFANM-09-R-00108 Oakland ARTCC Refrigerator-Freezer Floor.pdf This project covers the requirements for all work associated with the walk-in-freezer/refrigerator floor replacement project at the Oakland Air Route Traffic Control Center in Fremont, CA. The Contractor shall furnish all labor, materials, and equipment in strict accordance with the referenced project specifications, drawings, and applicable FAA standards. All materials and equipment not indicated in the specification as GFM, shall be supplied by the Contractor. SCOPE OF WORK SUMMARY: Perform the following scope of work, in strict adherence with the specifications and FAA standards:A.Remove existing refrigerator/freezer floor, any sub floor, and moisture barrier material. The total size of both floors is approximately 11' x 15.5'. B.Remove mold, if any found, and disinfect refrigerator/freezer by using approved industrial practices. C.Provide temporary cold storage for the length of the project. Remove contents from existing refrigerator/freezer, transfer the contents to the temporary storage space, and then move the contents back to the original refrigerator/freezer after the new floor, sub floor, and moisture barrier has been installed. D.Supply needed material and construct a temporary barrier to isolate the work area from the rest of the kitchen. E.If any mold is found, remove mold and disinfect refrigerator/freezer using industry accepted standards. F.Install insulation/moisture barrier, sub floor. Install new stainless diamond plate so as to restore the refrigerator/freezer to like new condition. G.Before the contents are returned to the refrigerator/freezer, the area is to be cleaned with a bleach solution or other industrial material so as to disinfect the total refrigerator/freezer area.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/NMR/DTFANM-09-R-00108/listing.html)
- Record
- SN01867383-W 20090709/090708000925-3d01050ce83d126600d84c4b8df4e33b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |