Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 10, 2009 FBO #2783
MODIFICATION

Y -- CUSTER NATIONAL FOREST - D2 BRIDGE ROCK CREEK CANAL

Notice Date
7/8/2009
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-0355-S-09-0021
 
Archive Date
9/30/2009
 
Point of Contact
Gary B. Stephens, Phone: (406) 587-6774, Jeannie Leth, Phone: 406-495-3707
 
E-Mail Address
gbstephens@fs.fed.us, jleth@fs.fed.us
(gbstephens@fs.fed.us, jleth@fs.fed.us)
 
Small Business Set-Aside
Total HUB-Zone
 
Description
Rock Creek West Canal Bridge Replacement, Lower Spring Creek Bridge Replacement and Additive Bid Item: Willow Creek Bridge Replacement The work shall consist of the removal and disposal of the existing bridges and replacing with a new treated timber bridges. The work includes structural excavation; clearing and grubbing; excavation; and reshaping of the channel; furnishing and placement of a geocell foundation, and precast grade beams; furnishing and installing glued-laminated deck, and curb, timber running plank, and similar bridge appurtenances; placing riprap, roadway excavation and embankment; furnishing and placing aggregate surfacing, and furnishing and installing type 3 object markers with posts. All removed bridges and construction materials will be transported off National Forest System (NFS) Lands and shall be disposed of in accordance with all local and state laws and regulations. The intent of the contract is to provide for the construction and completion of the work described. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Project Location. The project is located on the Beartooth Ranger District, Custer National Forest, near Red Lodge, MT. The Lower Spring Creek Bridge is located in Section 36, T8S, R19E, on the NFS Road #2379A Spring Creek Road, approximately 7 miles southwest of Red Lodge, MT. The Rock Creek West Canal Bridge is located in Section 6, T8S, R20E, on Road #2071A, approximately 2 miles west of Red Lodge, MT. The Willow Creek Bridge is located on the Palisade Road #2010 in Section 31, T7S, R20E at the entrance to Palisades Campground. Price Range. Between $250,000 and $500,000 (base + additive). Pre-Bid Tour. A pre-bid tour will be held on July 22, 2009 at 1300 (1:00 P.M.). All bidders are encouraged to visit the project site. Directional information may be obtained from the Beartooth Ranger District Office in Red Lodge, MT, telephone 406-446-2103. For additional contract information contact David Shimek, COR, at the Supervisor’s Office, Custer National Forest at (406)657-6205 ext. 201 for contract information. It is estimated that the work will begin in September 2009. Work shall be completed by August 1, 2010. Work on the Lower Spring Creek Bridge must be completed after September 7, 2009 and no later than May 28, 2010. Work on the Willow Creek Bridge cannot be performed between March 1 and July 15. Government-Furnished Materials. The Government shall provide furnished timber stringers for the Willow Creek Bridge, available at the Rock Creek Work Center, located approximately 2 miles west of Red Lodge, MT in Section 6, T8S, R20E. The Contractor must coordinate with the CO for access, loading, and hauling of stringers. It is anticipated the solicitation will be posted to the FBO website the week of July 13th and will remain open for 30 days. Questions of a technical nature can be directed to David Shimek at (406) 657-6205 x201. Direct contract related questions to Gary Stephens at (406)587-6774. This project will be advertised as a SBA Certified Total HUBzone (Historically Underutilized Business zone) set-aside per FAR 19.1305.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0355-S-09-0021/listing.html)
 
Place of Performance
Address: Beartooth Ranger District - Custer National Forest, Location details outlined in description., Red Lodge, Montana, 59068, United States
Zip Code: 59068
 
Record
SN01868781-W 20090710/090709000346-b01f4c55e437057f9059e76435d6df90 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.