Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 12, 2009 FBO #2785
AWARD

Y -- Sand Dollar and Plaskett Comfort Stations

Notice Date
7/10/2009
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-5 Southern California Province, Angeles N.F., 701 N. Santa Anita Ave., Arcadia, California, 91006
 
ZIP Code
91006
 
Solicitation Number
AG-91Y9-S-09-0007
 
Archive Date
7/25/2009
 
Point of Contact
David, Phone: 9093822635
 
E-Mail Address
dbhallen@fs.fed.us
(dbhallen@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Award Number
AG-91Y9-C-09-0005
 
Award Date
7/10/2009
 
Awardee
Sansone Company, Inc., 710 21 Fiero Lane, San Luis Obispo, California 93401, United States
 
Award Amount
$526,797.00
 
Line Number
All
 
Description
The project Contract award will consist of purchase and installation of three pre-engineered buildings for the Los Padres National Forest, Sand Dollar Picnic Ground, and Plaskett Campground. The building for Sand Dollar site 1 is a vault unit designed to provide two toilet rooms for beach visitors, and a chase area for storage of cleaning supplies. The buildings for Plaskett Creek sites 2 and 3 are flush toilets units designed to provide four toilet rooms for campground visitors, and a chase area for storage of cleaning supplies. The project also includes an exterior cold water shower at Sand Dollar; a new septic tank/leachfield, asphalt parking area at Plaskett site 2; and new water and sewer connections for Plaskett Creek Site 2 and 3, and concrete walkway installation at all sites. The project also includes repair of the existing stairway that provides access to the beach at Sand Dollar with pressure treated timber poles. Work also includes the demolition and removal of existing toilet buildings, pumping out and demolition of 2 existing septic tanks, removal of 3 pressure treated timber poles and shoring for the stairway repair, and removal of the concrete foundations. Work includes site grading, new utility connections and trenching. The work shall also include construction staking, quality control and erosion protection.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/91T5/Awards/AG-91Y9-C-09-0005.html)
 
Record
SN01871926-W 20090712/090711000453-4f752dcd295afccce55a7fe7e2919980 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.