Z -- RECOVERY--Z--Repair Masonry Features, Old Section, Building 160
- Notice Date
- 7/15/2009
- Notice Type
- Award Notice
- NAICS
- 236210
— Industrial Building Construction
- Contracting Office
- Department of the Army, U. S. Army Materiel Command, U.S. Army TACOM Life Cycle Management Command - Rock Island, TACOM - Rock Island, ATTN: AMSTA-AQ-AR, Rock Island Arsenal, Rock Island, IL 61299-7630
- ZIP Code
- 61299-7630
- Solicitation Number
- W52H09-08-D-5005-0141
- Response Due
- 5/26/2009
- Archive Date
- 9/5/2009
- Point of Contact
- Steven Perry, 3097821088<br />
- E-Mail Address
-
TACOM - Rock Island
(steven.roderick.perry@us.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W52H09-08-D-5005-0027
- Award Date
- 7/15/2009
- Awardee
- Russell Construction Co., Inc., 4600 E. 53rd St., Davenport, IA 52807-3479
- Award Amount
- 1170513.00
- Line Number
- 0001
- Description
- RECOVERY The scope of work includes thedesign, demolition and repair of concrete and structure on the designated area of the old and new sections of the Hydro-Electric Plant/Building 160. The work shall include a base bid and four optional bids. The Base bid shall include repair to the hole in the upstream wall at Bay 16, repair of the scour damage and the timber crib substructure beneath the downstream south bulkhead, repair of the mudline scour beneath the downstream outlet tunnels of Bays 2 and 3. Option 1 shall include repair of the upstream stone retaining wall at the west end of the dam, repair of the concrete main floor at the north end of the new section, construct a long-term repair for the exposed reinforcing bars in intake bulkheads of the new section. Option 2 shall include repair of the downstream concrete face of Bays 21 24, repair of severe scale on the downstream dam face of Bays 17, repair of construction joints within the outlet tunnels for Bays 1 and 3, repair of the concrete upstream bullnose on the north side of Bay 1. Option 3 shall include a repair to fill the existing water storage pits (previously for fire protection) and cap with concrete. Option 4 shall include a height extension of the downstream south retaining wall and fill the enclosed area. This firm fixed price task order was awarded under Contract W52H09-08-D-5005 which was awarded under full and open competition using best value source selection procedures to Russell Construction Co. Inc. of Davenport, Iowa on August 21, 2008. The design build and construction services awarded under this contract include the type of work designated in this synopsis.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/USAMC/DAAE20/W52H09-08-D-5005-0141/listing.html)
- Record
- SN01876637-W 20090717/090716000607-7a86dcab45029ffd70a80a285f6fe3fe (fbodaily.com)