MODIFICATION
16 -- KC-135 Aircrew Training System (ATS) CLS Support - DRAFT documents/23 Jul 09
- Notice Date
- 7/23/2009
- Notice Type
- Modification/Amendment
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Hill AFB OO-ALC, OO-ALC/PKXB, 6038 Aspen Ave (Bldg 1289), Hill AFB, Utah, 84056
- ZIP Code
- 84056
- Solicitation Number
- FA8223-10-R-135TS
- Response Due
- 12/4/2008
- Point of Contact
- Lance S Hardman, Phone: (801) 777-6295
- E-Mail Address
-
lance.hardman@hill.af.mil
(lance.hardman@hill.af.mil)
- Small Business Set-Aside
- N/A
- Description
- Latest answers to questions (mostly related to VSR), consolidated report without attribution. DRAFT Model Contract with CLINS, Clauses and latest SECTIONs L (Instructions to Offerors) and M (Evaluation Criteria). Performance Assessment Plan (PAP) - how the Government will measure performance Exhibit B, CDRLS, Technical Data and reporting, Priced Exhibit A, CDRLs, DD Forms 1423, not separately priced reporting for contract mgt Atch16, Base Support Re-competition Support Package (RSP), inventory list and master document list Wage Determs by site - current as of 23 jul 09 subcontractor consent form unchanged Past Perf Questionnaire Questionnaire cover letter Atch 9 Past Perf Direct info Site List (unchanged) Services Delivery Summary under principles of Performance Based Services Acquisition (PBSA) Total Evaluated Price (TEP) worksheet. Concise depiction of CLINs (first year only in draft), fro fill-in by offeror. to facilitate evaluation of price/cost by the cost/price team. Fixed Rate Table. Includes load factors for cost reimbursed items. Please comment on the skills categories or matrix. These are to be comprehensive - may need to add some. Requirements Traceability Matrix (RTM), PWS Baseline PWS atch 1 to RFP, Rev 8 The KC-135 ATS Acquisition Strategy, substantially represented by postings of documentation and amendments to this notice, was approved by the AF PEO/Services/CM on 13 Jul 09. This includes approval of the plan to compete and contract for a ten (10) year program. The last two (2) years of this contract will be priced as options, with special contingency for approval by the Services PEO based on review of Status of Mods in year six (6). The latest round of updated and new documentation in comprehensive package posted to this notice today, 23 Jul 09, represents near final DRAFT RFP status. Some of the attachment numbers will have changed. ALL PREVIOUS VERSIONS OF THESE DRAFT DOCUMENTS SHOULD BE DISCARDED. Comments and questions, leading to the last planned Industry Days Conference at Hill AFB on 11 Aug 09, are invited. Latest consolidated answers to questions and comments received (mostly related to VSR) are also posted with the new package (without attribution). Please note that for the CLIN structure in applicable DRAFT documents, we are still depicting only the first year. CLINS 0001-0015 in the Model would replicate in the subsequent out-years. Other CLINs are for one-time tasks, the VSR Mod or for Ramp-up. Funding has been identified only for the Ramp-Up, if applicable, (FY 2009 O&M annual appropriation) and for the VSR first unit (3010 investment funds) which are the only funds to be obligated at the outset. All other CLINs are either subject to availability of funds (O&M), or are priced options to be exercised at the unilateral discretion of the Government.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8223-10-R-135TS/listing.html)
- Place of Performance
- Address: Multiple locations, CONUS and OCONUS, United States
- Record
- SN01884855-W 20090725/090723235636-377f6aad4385a16e1717fb0f133254fd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |