SOLICITATION NOTICE
Z -- RECOVERY--Z--Photovoltaic System, Marine Air Ground Task Force Training Command, Twenty-Nine Palms, CA
- Notice Date
- 7/24/2009
- Notice Type
- Presolicitation
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- Department of the Navy, Naval Facilities Engineering Command, NAVFAC Southwest, Desert IPT, N62473 NAVFAC SOUTHWEST, DESERT IPT CODE ROPDA 1220 Pacific Highway San Diego, CA
- ZIP Code
- 00000
- Solicitation Number
- N6871104D3001X096
- Response Due
- 8/24/2009
- Archive Date
- 9/24/2009
- Point of Contact
- Monica Hernandez (619) 532-4052 Melissa Bookheimer, Contracting Officer (619) 532-1301
- Small Business Set-Aside
- N/A
- Description
- THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTORS UNDER MACC CONTRACT N68711-04-D-3001, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION AND RENOVATION OF VARIOUS DRY UTILITIES AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO ARIZONA, CALIFORNIA, NEVADA AND NEW MEXICO. The MACC Contractors listed on this MACC Group 0036 are as follows: Stronghold Engineering Incorporated, (951) 684-9303; Synergy Electric Company, (619) 596-7688; and Syska Hennessy Group Construction, Inc., (310) 312-0200. NOTE: This is not a public opening, therefore, please contact the contractors listed above for copies of the solicitation, specifications, or drawings. The solicitation will not be made available on this website. Project Description: The intent of this RFP is to obtain all services, labor, materials and equipment necessary for the construction of AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) TAS P180M Install Photovoltaic System on roof top at buildings 1201, 1202, 2008, 2067, and 2068 at Marine Air Ground Task Force Training Command (MAGTFTC) in 29 Palms, CA, including bond costs, complete in accordance with the RFP, but not including work indicated or specified to be provided under any other offer items. The duration of this project is 380 calendar days from the date of award, which consists of 365 calendar days, and 15 calendar days for bonds submissions. Project Issue Date of RFP to MACC Contractors: 24 July 2009 Construction Cost Limit is between $500,000 and $5,000,000.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711AB/N6871104D3001X096/listing.html)
- Record
- SN01886589-W 20090726/090724235936-b8d3fd795e8b9b9c732f96a8a435e929 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |