AWARD
56 -- RECOVERY--56--Coralville Lake Recretional Area, Iowa City, IA. Waterborne Restroom/Shower Facility Installation and Waterless Vault Restroom
- Notice Date
- 7/28/2009
- Notice Type
- Award Notice
- NAICS
- 332311
— Prefabricated Metal Building and Component Manufacturing
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Rock Island, US Army Engineer District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
- ZIP Code
- 61204-2004
- Solicitation Number
- W912EK-09-T-0059
- Archive Date
- 8/27/2009
- Point of Contact
- Steven Jessen, 309-794-5259<br />
- E-Mail Address
-
US Army Engineer District, Rock Island
(steven.jessen@us.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EK-09-F-0051
- Award Date
- 7/28/2009
- Awardee
- ROMTEC, Inc.<BR>18240 Northbank Rd<BR>Roseburg, OR 97470-8416
- Award Amount
- 785,000.00 Recovery, 29,450.46 Non-Recovery
- Line Number
- 0001-0011
- Description
- Water Borne Restroom / Shower Facility Installation Requirements: Contractor is responsible for turnkey construction to include connection to utilities, excavation and rebar reinforced concrete, pouring of footing, foundation and slab, floor drains, installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed insulated roof. Trim out of the complete building with all fixtures. Top of slab will be 12-18 above existing grade. Government will bring water, sewer and electrical service to within 10 feet of the foundation. Restroom accessories such as toilet paper dispensers, signs, trash cans and sanitary napkin receptacles will be supplied and installed by the government. Waterless Vault Restroom Installation Requirements: Contractor responsible for turnkey construction to include excavation, tank placement, backfill, concrete, rebar, pouring of footing, foundation and slab, building installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed, insulated roof. Trim out of the complete building with all fixtures and accessories. Top of slab will be 12-18 above existing grade.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/Awards/W912EK-09-F-0051.html)
- Record
- SN01890664-W 20090730/090729000815-4c5b2e3f4ee5b3daafb1b0acb8cc5296 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |