Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 30, 2009 FBO #2803
AWARD

56 -- RECOVERY--56--Coralville Lake Recretional Area, Iowa City, IA. Waterborne Restroom/Shower Facility Installation and Waterless Vault Restroom

Notice Date
7/28/2009
 
Notice Type
Award Notice
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Rock Island, US Army Engineer District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-09-T-0059
 
Archive Date
8/27/2009
 
Point of Contact
Steven Jessen, 309-794-5259<br />
 
E-Mail Address
US Army Engineer District, Rock Island
(steven.jessen@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EK-09-F-0051
 
Award Date
7/28/2009
 
Awardee
ROMTEC, Inc.<BR>18240 Northbank Rd<BR>Roseburg, OR 97470-8416
 
Award Amount
785,000.00 Recovery, 29,450.46 Non-Recovery
 
Line Number
0001-0011
 
Description
Water Borne Restroom / Shower Facility Installation Requirements: Contractor is responsible for turnkey construction to include connection to utilities, excavation and rebar reinforced concrete, pouring of footing, foundation and slab, floor drains, installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed insulated roof. Trim out of the complete building with all fixtures. Top of slab will be 12-18 above existing grade. Government will bring water, sewer and electrical service to within 10 feet of the foundation. Restroom accessories such as toilet paper dispensers, signs, trash cans and sanitary napkin receptacles will be supplied and installed by the government. Waterless Vault Restroom Installation Requirements: Contractor responsible for turnkey construction to include excavation, tank placement, backfill, concrete, rebar, pouring of footing, foundation and slab, building installation or construction to include reinforced CMU walls, 8 solid concrete and steel-framed, insulated roof. Trim out of the complete building with all fixtures and accessories. Top of slab will be 12-18 above existing grade.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/Awards/W912EK-09-F-0051.html)
 
Record
SN01890664-W 20090730/090729000815-4c5b2e3f4ee5b3daafb1b0acb8cc5296 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.