Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 31, 2009 FBO #2804
MODIFICATION

Y -- Modification is to add specifications that were not included in original document.

Notice Date
7/29/2009
 
Notice Type
Modification/Amendment
 
NAICS
238190 — Other Foundation, Structure, and Building Exterior Contractors
 
Contracting Office
Department of the Army, Army Contracting Agency, North Region, ACA, Fort A. P. Hill, ACA, Fort A.P. Hill, Directorate of Contracting, 14136 Burke Road, Fort A.P. Hill, VA 22427-3116
 
ZIP Code
22427-3116
 
Solicitation Number
W91QEY09R0030
 
Response Due
8/5/2009
 
Archive Date
10/4/2009
 
Point of Contact
Kendra Harley, 804-633-8328<br />
 
E-Mail Address
ACA, Fort A.P. Hill
(kendra.harley@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
SCOPE OF WORK RENOVATE MULTI-PURPOSE COURT(179) The following is the Scope of Work to renovate (1) existing outdoor Multi-Purpose Athletic Court: The Contractor shall provide all Labor,equipment and material for the renovations in accordance with provisions of this Scope of Work. 1)Replace All bent or damaged fence posts/rails as needed and required. 2)Area involve measures 55X110. There is approx. 800L.F. of existing cracks that need to be sealed. 3)Apply 2 asphalt overlay and compact to 1. 4)Apply (2) coats of latex modified sealer over the entire asphalt surface as needed. 5)Court is to be re-lined. Layout,tape 2wide yellow playing lines to dimensions of NBA regulation measurements/size. 6)Replace (2) existing backboards, and rims,paint as needed. CONTRACT-999 All material utilized will be in compliance with Local,State,Department of the Army and Federal guidelines and regulations.All Labor shall be performed by trained craftsman in accordance with established industry standards. GENERAL REQUIREMENTS: 1)The Contractor shall provide a standard(1) one year warranty for workmanship and a minimum (5) year warranty on Product(Material). 2)The Contractor shall be responsible for disposal of all trash and debris resulting from repair work.Construction debris shall be disposed off-post at the expense of the Contractor. 3)The Government will conduct random inspections during the progress of work. The Contractor shall correct defective workmanship or materials at no additional expense to the Government. 4)The Contractor shall coordinate scheduling /use of court with DPW(Project Mgr.) and MDW. 5)Normal working hours @ Fort A. P. Hill are 0800-1630 Monday through Friday,exclusive of holidays. The Contractor shall obtain permission in advance when it is desired they need to work at any time other than normal working hours.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/DABJ/DABJ09/W91QEY09R0030/listing.html)
 
Place of Performance
Address: ACA, Fort A.P. Hill Directorate of Contracting, 14136 Burke Road Fort A.P. Hill VA<br />
Zip Code: 22427-3116<br />
 
Record
SN01891611-W 20090731/090730000955-c12395c8241c757eba6db533ed8d429d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.