Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 05, 2009 FBO #2811
AWARD

M -- RECOVERY--M---MODIFICATION NOTICE W91278-09-55-ARRA, Provide for repair and upgrades at Walter F. George Lake ACF Rivers Project, Fort Gaines, Georgia.

Notice Date
8/3/2009
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, US Army Engineer District, Mobile, US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-09-55-ARRA
 
Archive Date
9/2/2009
 
Point of Contact
ANGELA TAYLOR, 251-694-3858<br />
 
E-Mail Address
US Army Engineer District, Mobile
(angela.j.taylor@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
DACW01-03-C-0017-P00065
 
Award Date
7/31/2009
 
Awardee
Anderson Construction Company of Fort Gaines<BR>58 Crozier Lane<BR>Fort Gaines, GA 39851-2649
 
Award Amount
4,095,908.87 Recovery
 
Line Number
0011 and 0012
 
Description
This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Utilizing American Recovery and Reinvestment Act funds, the modification will increase the level of effort originally contracted for, to add the following work: 1) Upgrade campsites to 50 amp service at Bluff Creek (88), Cotton Hill (104), Hardridge (77), White Oak (94); 2) Plan, layout and construct replacement gate attendant station at Bluff Creek, Cotton Hill, Hardridge, and White Oak campgrounds; 3) Renovate Fish Cleaning Station at Cotton Hill; 4) Install new Fish Cleaning Station including drain field and septic tank at Hardridge; 5) Plan, layout and construct in-park water service connections for Cotton Hill, 6) Plan, layout and construct in-park sewer service connections for 104 campsites in Cotton Hill; 7) Purchase and install pre-fabricated group picnic shelter for White Oak, 8) Purchase and install prefab bridge to access new picnic shelter, 9) Purchase and install prefab group picnic shelter at White Oak, shelter was destroyed during storm. This work is within the scope of the original contract technical provisions and includes maintaining and repairing buildings, structures, facilities, and their mechanical, electrical, plumbing, sewage and water systems. Contract clauses required for projects involving Recovery Act funds have been incorporated into the existing contract. The existing contract must be used for the following reasons: 1) A detailed scope of work can not be prepared. The extent of the work and the resources needed cannot be fully determined prior to starting the work, because conditions are different at each area. 2) The contractor is responsible for the complete inspection, maintenance, and repair of all project buildings and structures in 17 recreation areas, three operations areas, and the Project Management Office. 3) The scheduling, coordination, quality assurance and/or subcontracting for the work to be performed are within the scope of the original contract technical provisions and must be accomplished under the terms of the existing contract. The incumbent contractor not only has the management, technical, and administrative skills to efficiently and effectively accomplish this work at a reasonable cost, but also the advantage of the flexibility to readily adjust to any unforeseen obstacles encountered during installation. 4) This contract enables repairs to begin immediately after and during inspections without a detailed scope of work and thus minimizes the time the facilities are closed and the impact on public access to camping and recreation during the busiest season of the year. The American Recovery and Reinvestment Act (ARRA) contains specific acquisition requirements that must be met when using funds appropriated by the Act. Acquisitions must comply with FAR, and to the maximum extent practicable, be awarded under competitive procedures as fixed-price (FP) contracts. The Mobile District intends to use the current CPAF contract to meet it requirements. Though not a FP contract, it was awarded competitively as a small business set aside. The contract type was selected to provide the contractor with the greatest incentive for efficient and economical performance, given the types of services to be performed. Furthermore, the existing Operation and Maintenance contractor has experienced personnel that are already on site and ready to perform the work. Accordingly, it is deemed to be in the best interest of the government and in compliance with the goals of the Recovery Act to use the existing Operation and Maintenance contract to accomplish the requirements listed above.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-09-55-ARRA/listing.html)
 
Record
SN01897342-W 20090805/090803235948-04779604a91ee5447f79664f33336e71 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.