Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 08, 2009 FBO #2814
AWARD

F -- Remove all trees 6 inches and larger in diameter will be removed from the south face (lake side) of the Saylorville Lake Barrier Dam.

Notice Date
8/6/2009
 
Notice Type
Award Notice
 
NAICS
561730 — Landscaping Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, U.S. Army Engineer District, Rock Island, US Army Engineer District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK09T0070
 
Response Due
7/28/2009
 
Archive Date
9/28/2009
 
Point of Contact
Anne M Fleischman, 309-794-5488<br />
 
E-Mail Address
US Army Engineer District, Rock Island
(anne.m.fleischman@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EK-09-P-0340
 
Award Date
8/5/2009
 
Awardee
LAWNPRO, LLC<BR>POLK CITY, IA 50226-1162
 
Award Amount
9,000.00
 
Line Number
0001
 
Description
The flood of 2008 deposited large quantities of driftwood on the face of the Saylorville Lake Barrier Dam. The Barrier Dam is located off of highway 415 adjacent to the Saylorville Marina and approximately 1.5 miles south of Polk City, IA. Contractor will be responsible for the removal and disposal of all logs on the dam over 6in in diameter (measured exceeding anywhere on the log length). Access to the driftwood is only available from the Neal Smith Bike Trail located at the foot of the dam. Care in removal is needed to insure no damage is done to the rip rap surface of the dam. Any damage or displacement of rip rap shall be replaced by the contractor at their expense. Once driftwood logs are removed from the face of the dam they are to be hauled to a designated dump site where they are to be chipped. On the west side of the barrier dam between the bike trail and the dam is a small grove of trees which need to be removed. Trees need to flush cut to the ground. All trees in the area need to be taken out except for the Pin Oak. Pin Oak trees will be marked by the Government with orange paint. Contractor shall use extreme care not to damage the Pin Oak trees. Work for this contract is to be completed thirty days after contract award. Work days are Monday through Friday between the hours of 7 am and 5 pm. No work will be permitted on weekends or holidays. Five working days will be allowed to remove the driftwood from the rip rap. Chipping of the driftwood will be completed within two weeks of driftwood removal from the dam. Inclement weather may inhibit safe work and if so, the Government will allow for additional work days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK09T0070/listing.html)
 
Record
SN01902729-W 20090808/090807001427-ce266f923a41e80bd0b546f3f0dd9caa (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.