Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 30, 2009 FBO #2836
SOLICITATION NOTICE

61 -- FLEXIBLE BRAID #CN-1A-0831 IT5 OR EQUAL PER ATTACHED DESCRIPTION1/2-13 HHCS BOLT ASSY L=1 3/4 PER ATTACHED DESCRIPTION

Notice Date
8/28/2009
 
Notice Type
Presolicitation
 
Contracting Office
BUREAU OF RECLAMATION - GCDAM 805 BUREAU ST./BOX 1477 PAGE AZ 86040
 
ZIP Code
86040
 
Solicitation Number
09PS4P301
 
Response Due
9/4/2009
 
Archive Date
8/28/2010
 
Point of Contact
Denise M. Westenskow Contract Specialist 8015243876 dwestenskow@uc.usbr.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
N/A
 
Description
PROVIDE FLEXIBLE BRAIDS AND STAINLESS STEEL CONNECTING HARDWARE FOR WESTINGHOUSE 6500 AMP, 15 KV, BIL = 110 KV; METAL ENCLOSED ISOLATED PHASE BUS. 216 EACH - DELIVERED IN 2 SETS OF FLEXIBLE BRAID #CN-1A-0831 IT5 OR EQUAL. 864 EACH - DELIVERED IN 2 SETS OF 1/2-13 HHCS BOLT ASSY L=1 3/4 VENDOR NEEDS TO PROVIDE 2 SETS OF THE FOLLOWING:CONNECTIONS TO BE PROVIDED ARE THE 6 ISOLATED PHASE CONNECTIONS ON THE TRANSFORMER DECK THAT TIE THE OUTDOOR BUS TO THE HIGH-CREEP INSULATION BUSHING WHICH PENETRATES THE TRANSFORMER DECK. EACH PHASE CONNECTION CONSISTS OF (18EA) FLEXIBLE BRAIDS; DELTA UNIBUS PART #CN-1A-0831 IT5, OR EQUAL, FOR A TOTAL OF 108 EA.EACH PHASE CONNECTION ALSO CONSISTS OF (72EA) STAINLESS STEEL BOLT ASSEMBLIES; DELTA UNIBUS PART # 62583X18 GR4 LENGTH 1 3/4", OR EQUAL FOR A TOTAL OF 432 EA. THIS NEEDS TO INCLUDE BELLVILLE WASHERS.NEEDED ALSO IS A TUB OF MOBIL 28 GREASE (OR EQUAL) FOR THESE BUS CONNECTIONS. REFER TO THE FOLLOWING WESTINGHOUSE DRAWINGS:1. CN63D1248-USBR-GLEN CANYON POWER PLANT 7500, 6500, 3500, 1500 & 1200 AMP 15KV ISOLATED PHASE BUS BUSHING ASSEMBLY.2. CN-63J1029 - USBR- GLEN CANYON POWER PLANT 7500, 6500, 3500, 1500 & 1200 AMP 15 KV ISOLATED PHASE BUS CONNECTION 6500 A. ONE SET OF THESE FLEX BRAIDS, CONNECTING HARDWARE & GREASE NEEDED ON SITE BY OCTOBER 1ST, 2009. THE SECOND SET, NEEDS TO BE ON SITE BY NOVEMBER 1, 2009. FLEXIBLE BRAID: 216 EACH TOTAL NEEDED. HALF OF THE MATERIAL(108 EA) NEEDED ON SITE BY OCTOBER 1ST, 2009.THE BALANCE (108 EA) CAN ARRIVE BY NOVEMBER 1ST, 2009 BOLT ASSEMBLY: HALF OF THIS MATERIAL(432 EA) NEEDS TO BE ON SITE BY OCTOBER 1, 2009 AND THE REMAINING HALF (432EA) BY NOVEMBER 1ST, 2009PLEASE INCLUDE ESTIMATED FREIGHT COSTS IN YOUR QUOTE. ALL FREIGHT CHARGES OVER $100.00 REQUIRES A FREIGHT INVOICE DIRECTLY FROM THE FREIGHT COMPANY AND MUST BE SUBMITTED WITH THE FINAL INVOICE.Quotes can be faxed to: Kay CowanGlen Canyon Field DivisionPhone:928-645-0403Fax: 928-645-0410
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BR/BR/09PS4P301/listing.html)
 
Place of Performance
Address: BUREAU OF RECLAMATIONGLEN CANYON DAM FIELD DIVISIONHIGHWAY 89PAGE, ARIZONA 86040
Zip Code: 86040
 
Record
SN01931677-W 20090830/090829003406-c343665cd16fc144e468c2e431083f62 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.