Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 02, 2009 FBO #2839
MODIFICATION

37 -- 3 prefabricated, painted, dipping vats.

Notice Date
8/31/2009
 
Notice Type
Modification/Amendment
 
NAICS
332312 — Fabricated Structural Metal Manufacturing
 
Contracting Office
Department of Agriculture, Office of Procurement and Property Management, Procurement Operations Division, 300 7th Street, S.W., Room 377, Reporters Building, Washington, District of Columbia, 20024
 
ZIP Code
20024
 
Solicitation Number
298628
 
Archive Date
9/29/2009
 
Point of Contact
Carol R. Dingess, Phone: 6123363208
 
E-Mail Address
Carol.Dingess@aphis.usda.gov
(Carol.Dingess@aphis.usda.gov)
 
Small Business Set-Aside
N/A
 
Description
Questions 1-5 Q-1. Need to know sizes of vat, inside and out, as well as associated members, spacing, sizes; type of material like angle, channel, flat etc. welding requirements (full pen, perimeter, etc.) and it has to be clear enough that when we reproduce it we can read the writing. #1-A. 27 ' long, 32" I.D, 8' high, Floor length 16", Exit ramp starts out to top at 16' point, with 24'' rise straight up from floor to exit ramp made of 1/4 plate. 3x3x1/2 angle around outside top,bottom & on corners to include outside of ramp. 2"x 1/4" strap, vertically every 16" from top to bottom,welded on edge or placed on edge of strap for strengthening. This strap can be welded in 6" spacings. 1 stake pocket that acomodate 2"x4" board on the top every 4.' A second row of stake pockets 12" below the top ones. All welding is solid except vertical straps. Uprights under exit ramp are 3" square tubing to include the frame under these uprights Q-2. There is a description in the synopsis that we can not make any sense of its meaning "hide away spreader bar to lift. Middle wall retainers to clamp wall to keep wall straight with 3 ft spikes" We can not determine what this means. #2-A. Disregard Q-3. Reviewing the data sheet and sketch, I do not see where the material is called out. Is it stainless steel? #3-A. No, It is not stainless steel, only 1/4 or 3/8" steel plate. Q-4. We quoted hot rolled steel and prime/paint on the outside only. If the material or paint requirements need to be different, we can adjust our quote. #4-A. No stainless. Please paint inside and out. Q-5. Is the paint only on the outside. #5- A. Cleats on exit ramp need to be 2 1/2'' x 2 1/2'' x 3/8'' angle iron,30'' long & 1' apart going up to exit. With 3 pieces of 1/2" rod cut in 2 1/2'' pieces put under each one to allow drainage under back into vat. Do not any bolts for this. Additional info: Needs lifting eyes in each corner(4) that will acomodate 2 3/8'' tubing lifting device that we have. These lifting eyes should slide down out of the way when not in use. Ideal would be U shaped device made out 3/4'' rod. This portable vat will weigh approx. 8000 lbs. when finished. Submit faxed or emailed quotations to Purchasing Section ag (612) 336-3550, Attention Carol Dingess. Quotations are due by September 14, 2009 by 4:00pm Eastern Time. Simplified Acquisition Procedures will be used per FAR 12.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/OPPM/POD/298628/listing.html)
 
Place of Performance
Address: 7209 E. Saunders, Laredo, Texas, 78041, United States
Zip Code: 78041
 
Record
SN01933673-W 20090902/090901000426-1b324d03c74a185aebf20a773936c49e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.