AWARD
P -- RECOVERY: Environmental remediation of Mound Operable Unit 1 of Mound Site
- Notice Date
- 9/8/2009
- Notice Type
- Award Notice
- NAICS
- 562910
— Remediation Services
- Contracting Office
- Department of Energy, Federal Locations, All DOE Federal Contracting Offices, Various, Various locations, 20585
- ZIP Code
- 20585
- Solicitation Number
- DEAT3007CC00009M021
- Point of Contact
- Derrick J. C. Franklin, Phone: (513) 246-0103, Angela Cooney, Phone: (513) 246-0562
- E-Mail Address
-
derrick.franklin@emcbc.doe.gov, angela.cooney@emcbc.doe.gov
(derrick.franklin@emcbc.doe.gov, angela.cooney@emcbc.doe.gov)
- Small Business Set-Aside
- N/A
- Award Number
- DEAT3007CC00009M021
- Award Date
- 9/4/2009
- Awardee
- Accelerated Remediation Company, 1075 S. Utah Avenue, Suite 200, Idaho Falls, Idaho 83402, United States
- Award Amount
- $19,700,000
- Description
- RECOVERY: This award provides funding for the completion of the Mound Operable Unit 1 Project to include investigation and remediation as required of the remaining Operable Unit 1 area consisting of the following: removing overburden soil within Operable Unit down to the historic waste level; removing and transporting waste from the historic landfill area remaining below and in the general area of Operable Unit 1; and removing overburden from the Operable Unit 1 waste area, and transporting and stockpiling this to the area south of the Operable Unit 1 excavation area where it will be available for backfilling following the completion of all Operable Unit 1 excavation activities. The scope of work includes the following: contractor will complete the necessary site investigation, waste removal, waste management, and disposal of contaminated soils and debris; provide verification surveys and reports; backfill all excavations, and accomplish site restoration of the Operable Unit 1 area. Completing these activities will result in removal of the proposed Operable Unit 1 "no-dig" restriction thus leaving the Operable Unit 1area in a configuration consistent with the balance of the Mound Site. In remediation of the former Operable Unit 1 landfill, it is not practical to try and quantify in a statement of work the requirements in such a way as to award a Firm Fixed Price contract. With the uncertainty of funding, chasing of contaminated soil, groundwater remediation, facilities D&D etc, it is not conceivable that a contractor would be willing to take on that risk under a fixed price contract. However, the contractor is encouraged wherever possible to award subcontracts on a fixed prices basis.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/Awards/DEAT3007CC00009M021.html)
- Record
- SN01945182-W 20090910/090909084054-3ad33bdaa3359de7ee079f7f4cc70ffc (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)