Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 13, 2009 FBO #2850
SOURCES SOUGHT

Y -- Installation of Government provided playground and equipment,and impact tile.

Notice Date
9/11/2009
 
Notice Type
Sources Sought
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
US Army Corps of Engineer - Omaha District, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F09QG026
 
Response Due
9/23/2009
 
Archive Date
11/22/2009
 
Point of Contact
Francis Kocer, 402 667-2555
 
E-Mail Address
US Army Corps of Engineer - Omaha District
(francis.g.kocer@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
1. SCOPE OF WORK. The scope of work under these specifications consists of furnishing all labor, equipment, supplies and supervision necessary for the performance of all operations incidental to the installation of a new concrete sidewalk and pad as shown on the attached drawings and installation of government furnished playground equipment and impact tile on site. 1.1. Installation shall be for a surface mount Miracle model 714-S150 playground. After constructing and securing the playground equipment to the pad, impact tiles are to be glued in place on the surface of the concrete. All playground equipment, rubber impact tiles and tile glue are furnished by the Government for this contract. 1.2. Installation of this playground equipment shall be completed by July 1, 2010. 2. MEETING WITH THE CONTRACTING OFFICERS REPRESENTATIVE (COR). 2.1. The Contractor shall meet with the COR prior to commencement of work to discuss performance requirements, work schedule and administration of the contract. The Contractor shall also supply a safety plan at that time for the approval of the COR. The Contractor shall designate an on the job supervisor to act on the Contractors behalf when he or she is absent. 3. CONTRACTOR REQUIREMENTS. 3.1. The Contractor shall be a certified Miracle installer and have sufficient knowledge and skills to install this equipment as specified by the manufacturer. 3.2. The Contractor shall provide all necessary materials not supplied by the Government to install the structure. The Contractor will be responsible for securing the area during construction. C-PAGE-1 3.3. The Contractor will keep the area off limits to the public by adequate fencing or other control structure until all work is completed. The COR will perform a final inspection after notification by The Contractor that the project is finished. When the COR finds that the equipment is properly installed and ready for public use, the Contractor may remove any barricades and allow public access. 4. ACCIDENT PREVENTION. 4.1. The Contractor shall comply with all pertinent provisions of Corps of Engineers manual, EM-385-1-1, entitled Safety and Health Requirements, as amended, available from the Lake Manager, Gavins Point Project, Yankton, South Dakota. 4.2. The Contractor shall comply with applicable Occupational Safety and Health Act (OSHA) Standards. 4.3. The Contractor will maintain an accurate record of all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies and equipment incident to work performed under this contract. Accidents shall be reported to the COR within 12 hours. 4.4. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor. 5. SPECIFICATION FOR CONCRETE. 5.1. Concrete and base material for the sidewalk and slab for the playground equipment shall meet the requirements of the South Dakota Department of Transportations Standard Specifications For Roads and Bridges, Section 651, Concrete Sidewalk. Concrete shall also be fiber reinforced. The joint between the concrete slab and the sidewalk will be dowel reinforced to prevent settlement. 6. COORDINATION WITH OTHERS. Other contractors or government personnel will be working in assigned areas during this contract. The Contractor shall make every effort to work in harmony with all involved parties. BID SHEET Installation of concrete surfaces, Miracle model 714-S150 (surface mount) and rubber impact tile at the Cottonwood Campground of Gavins Point Project: $___________________________________ BY:_______________________________ ________________________________ _________________________________ Signature:________________________________ Date: ___________________________________
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F09QG026/listing.html)
 
Place of Performance
Address: US Army Corps of Engineer - Gavins Point Project 198 Toe Road Yankton SD
Zip Code: 57078
 
Record
SN01951085-W 20090913/090912001337-b4078a5fe49579ae6715424560e1a4dd (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.