FBO DAILY ISSUE OF SEPTEMBER 24, 2009 FBO #2861
AWARD

Y -- RECOVERY--Y--PROJECT #31991, Repair Building 28000, Div Headquarters, Building 28000, 1st CD, Fort Hood, TX

Notice Date
9/22/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-09-D-00XX-RFP-0002
 
Archive Date
10/22/2009
 
Point of Contact
Carol.A.Conaway, 817-886-1090
 
E-Mail Address
US Army Engineer District, Fort Worth
(carol.a.conaway@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9126G-09-D-0014-0006
 
Award Date
9/22/2009
 
Awardee
Blackhawk Ventures, LLC<BR>423 Cevallos<BR>San Antonio, TX 78204-1610<BR>DUNS: 146074740
 
Award Amount
4,743,492.00
 
Line Number
0001
 
Description
ARRA Restoration of 1st Calvary Division Headquarters Building Renovation (28000), Fort Hood TX. This is a design/build project with extensive engineering analysis, evaluation, testing and making immediate design and construction use of the findings of the analysis and evaluation to resolve the mold growth issues and construct the buildings and systems as a whole for the barracks and central plant facility using a sound engineering basis for the construction, reconstruction and remodeling of building HVAC systems and Central plant. The project will construct a comprehensive interior renovation of existing Building 28000, Fort Hood, TX. Bldg. 28000 is the Headquarters for the 1st Calvary Division at Fort Hood, currently occupied with minimal staff pending return of the main body of troops. This contract requires both design during construction by the Contractor and the actual construction. Work includes, but is not limited to: Selective interior demolition including abatement of asbestos containing vinyl composition tile and adhesive. Replacement of builders hardware and door signage; resealing windows; door and frame refinishing; and the provision of new doors and frames. Selective interior demolition of interior openings and the construction of new interior partitions; interior painting, caulking and refinishing of woodwork; demolition and replacement of flooring including wood, carpet, vinyl composition tile, ceramic tile; replacement of ceramic wall tile and wall coverings; and replacement of suspended ceiling systems; and the installation of new room signage. Sealing all penetrations in fire rated assemblies; resealing expansion joints to required fire rating; fire wall assembly upgrades. Resealing of exterior building joints. Replacement of the existing elevator with new hydraulic elevator. Construction work on the elevator pit, cylinder and foundation is to be completed by the date of beneficial occupancy (return of deployed troops). The renovation of all toilets, janitor closets and locker rooms, replacing all plumbing fixtures, trim, and piping; toilet and bath accessories, toilet partitions, lavatory counters; water cooler replacements; hot and cold water piping replacement and cleaning. Removal and replacement of supply diffusers, exhaust fans motors, radiant heaters, refrigerant piping, DX systems, and hot water pumps and boilers; construction of new air conditioning systems for all communication rooms; cleaning of all duct work and slot diffusers; and the cleaning and servicing a DX unit. Demolition and replacement of the cooling tower, mechanical rooms air handlers, ductwork insulation, hot and chilled water loop circuits, piping and insulation, valves and fittings. Chemically treat chilled and hot water piping systems and balance the HVAC system. Remove and replace the DDC HVAC control system. Demolition and replacement of lighting, switches, receptacles, fusible disconnects, emergency lights, and all related conduit, fittings, hangers and junction boxes. Provision of GFI receptacles and new connections and control circuits for all new and refurbished mechanical equipment. Rework of all power, communications, controls and other devices in support of wall demolition and new construction. Replacement of facility switch gear. Reinstallation of the Energy Management System in association with electrical work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/Awards/W9126G-09-D-0014-0006.html)
 
Record
SN01964725-W 20090924/090923000227-ff7a45b466313eb66f35bc94857bbd52 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.