Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 27, 2009 FBO #2864
AWARD

Z -- Aquatic Ecosystem Restoration Stevenson Creek - Section 206, Clearwater, Pinellas County, Florida

Notice Date
9/25/2009
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Engineer District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP08R0022
 
Archive Date
10/25/2009
 
Point of Contact
Willie Ann Mays, 904-232-3535
 
E-Mail Address
US Army Engineer District, Jacksonville
(ann.mays@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-09-C-0036
 
Award Date
8/17/2009
 
Awardee
Seek Enterprises, Inc., 104 Barkfield Street, Brandon, Florida 33511-7118
 
Award Amount
4,679,078.20
 
Line Number
0001 - 0007
 
Description
Project work is being conducted under Section 206 Authorization, Aquatic Ecosystem Restoration, for Stevenson Creek, Clearwater, Florida. Major elements of work include dredging, material separation, dewatering of muck material, transportation, upland disposal, and construction of mangrove creation areas. Dredge element includes dredging approximately 61,000 cubic yards of material from Stevenson Creek Estuary Reach 1 to a depth limit of -4.3 feet NAVD plus 0.5 foot allowable over depth, and dredge approximately 33,000 cubic yards of material from Estuary Reach 2 to a depth limit of -3.3 feet NAVD plus 0.5 foot allowable over depth. Material separation and dewatering element includes construction of dewatering site, and execution of operational process to separate sand and muck, and to dewater muck. Develop, maintain and restore 2 acre process and storage area. Transportation and Upland Disposal Element includes storage and transportation operations to handle sand, and haul dewatered muck to upland site located approximately 20 miles northeast of project site in Hillsborough County, Florida. Place material uniformly over approximated 25-acres of pastureland. Mangrove Creation area element includes construction of three, mangrove areas totaling 15,488 square yards of plantable surface utilizing clean sand from separation process. Transport excess sand to City of Clearwater Maintenance Yard located 5 miles from project site. Work also includes turbidity monitoring, Elutriate Toxicity Testing, Vibration Control Monitoring, and incidental related work. Performance Period is 270 calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/Awards/W912EP-09-C-0036.html)
 
Record
SN01971580-W 20090927/090926002849-30522043c0918a0876d897510ca4fa0c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.