Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 19, 2009 FBO #2856
MODIFICATION

Z -- RECOVERY--Z--RECOVERY EMBANKMENT REPAIRS AT BARDWELL DAM AND SHORELINE EROSION REPAIR AT LAVONIA PARK, LAVON LAKE, TEXAS

Notice Date
9/17/2009
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Engineer District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-09-R-0183
 
Archive Date
9/30/2009
 
Point of Contact
Allen R. Bassett, Phone: 8178861051
 
E-Mail Address
Allen.R.Bassett@usace.army.mil
(Allen.R.Bassett@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a special notice to inform the public of the use of the Recovery Act funds. RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO 8(a) CONTRACTOR B.W. STRAYHORN COMPANY, INC. The Contract Specialist for this action is Allen R. Bassett at 817-886-1051; or by e-mail at Allen.R.Bassett@usace.army.mil The objective is to repair shoreline erosion on the upstream embankment and flattening the downstream embankment at Bardwell Dam and repair shoreline erosion at Lake Lavon.. At Bardwell Dam, repair entails flattening the downstream embankment slope to match previous improvements to the adjacent embankment. Grade benched areas of shoreline to a uniform surface; apply geotextile filter fabric followed by application of bedding material; place riprap on repaired shoreline and tie in to exiting riprap. Approximately 2,100 linear feet of upstream shoreline will be armored by placement of riprap. Supportive activities will include earthwork, excavation, embankment fill, lime treatment, compaction, stockpiling of topsoil for reuse, downstream slope surface preparation, seeding, upstream slope shaping, geo-textile fabric placement, and placement of bedding material. Work requirements at Lake Lavon entails repair of erosion along a 1,300 feet long section of shoreline. Demolish the existing sea wall and follow with excavation of debris, backfill the area with sea wall debris at lowest level followed by topsoil, re-shape the disturbed area and follow with soil compaction, place geo-textile fabric and bedding materials, place rip-rap, and install a double-pipe safety rail fence. Total estimated cost is $2,000,000-3,000,000. POINT OF CONTACT: Allen R. Bassett 817-886-1051 US Army Corps of Engineers 819 Taylor Street, Room 2A19 Fort Worth, Texas 76102-0300
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-09-R-0183/listing.html)
 
Record
SN01960291-W 20090919/090918001621-22ab1cc1773afeb879ee6d656f88cfac (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.